Documents dont l'auteur est "Hajji, Adnène"

Pour citer ou exporter
Grouper par: Rôle | Auteurs ou autrices | Date de publication | Sous-type de document | Aucun groupement
Nombre de documents: 24

B

Boukamcha, H., Neumann, A., Rekik, M., Hajji, A., Caron Guillemette, G., & Farah, M. (2026). A deep reinforcement learning and a dynamic graph neural network-based scheduling agent to control a multi-task robot. Robotics and Computer-Integrated Manufacturing, 102, 103328 (27 pages). Lien externe

Berthaut, F., Pellerin, R., Hajji, A., & Perrier, N. (2019). The impact of project characteristics on the efficiency of activity overlapping in project scheduling. Journal of Modern Project Management, 7(1). Lien externe

Berthaut, F. (2015). Étude de l'impact du chevauchement sur les performances de projets complexes d'ingénierie [Thèse de doctorat, École Polytechnique de Montréal]. Disponible

Berthaut, F., Pellerin, R., Hajji, A., & Perrier, N. (2014). A Path Relinking-Based Scatter Search for the Resource-Constrained Project Scheduling Problem. (Rapport technique n° CIRRELT-2014-50). Lien externe

Berthaut, F., Pellerin, R., Perrier, N., & Hajji, A. (2014). Time-cost trade-offs in resource-constraint project scheduling problems with overlapping modes. International Journal of Project Organisation and Management, 6(3), 215-236. Lien externe

Berthaut, F., Grèze, L., Pellerin, R., Perrier, N., & Hajji, A. (2011). Optimal Resource-Constraint Project Scheduling with Overlapping Modes. (Rapport technique n° CIRRELT-2011-09). Lien externe

Berthaut, F., Pellerin, R., Perrier, N., & Hajji, A. (2011). Time-cost trade-offs in resource-constraint project scheduling problems with overlapping modes. (Rapport technique n° CIRRELT-2011-10). Lien externe

Boucherit, J.-B., Pellerin, R., Hajji, A., & Perrier, N. (2011). Une revue des méthodes pour l'ordonnancement de projets avec contraintes de ressources ou de matériel. (Rapport technique n° CIRRELT-2011-34). Lien externe

Boucherit, J.-B. (2010). Ordonnancement de projets internationaux avec contraintes de matériel et de ressources [Mémoire de maîtrise, École Polytechnique de Montréal]. Disponible

H

Hajji, A., Pellerin, R., Gharbi, A., Léger, P.-M., & Babin, G. (2016). Toward valuable prediction of ERP diffusion in North American automotive industry: A simulation based approach. International Journal of Production Economics, 175, 61-70. Lien externe

Hajji, A., Pellerin, R., Léger, P.-M., Gharbi, A., & Babin, G. (2012). Dynamic Pricing Models for Erp Systems Under Network Externality. International Journal of Production Economics, 135(2), 708-715. Lien externe

Hajji, A., Gharbi, A., Kenne, J.-P., & Pellerin, R. (2011). Production control and replenishment strategy with multiple suppliers. European Journal of Operational Research, 208(1), 67-74. Lien externe

L

Lalagüe, M. (2021). Modèle de planification tactique adaptée aux PME œuvrant dans un contexte ETO [Mémoire de maîtrise, Polytechnique Montréal]. Disponible

Lemieux, A.-A., Pellerin, R., Hajji, A., Léger, P.-M., & Babin, G. (octobre 2010). Analysing a Segmentation Pricing Strategy for ERP Systems under Diffusion Patterns [Communication écrite]. International Conference on ENTERprise Information Systems (CENTERIS 2010), Viana do Castelo, Portugal. Lien externe

N

Neumann, A., Zghal, Y., Cremona, M. A., Hajji, A., Morin, M. J., & Rekik, M. (2025). A data-driven personalized approach to predict blood glucose levels in type-1 diabetes patients exercising in free-living conditions. Computers in Biology and Medicine, 190, 110015 (27 pages). Disponible

Neumann, A., Hajji, A., Rekik, M., & Pellerin, R. (2024). Integrated planning and scheduling of engineer-to-order projects using a Lamarckian Layered Genetic Algorithm. International Journal of Production Economics, 267, 109077 (17 pages). Lien externe

Neumann, A., Hajji, A., Rekik, M., & Pellerin, R. (2023). Genetic algorithms for planning and scheduling engineer-to-order production: a systematic review. International Journal of Production Research, 30 pages. Lien externe

Neumann, A., Hajji, A., Rekik, M., & Pellerin, R. (juin 2022). A Didactic Review On Genetic Algorithms For Industrial Planning And Scheduling Problems [Résumé]. 10th IFAC Triennial Conference on Manufacturing Modelling, Management and Control (MIM 2022), Nantes, France. Publié dans IFAC PapersOnLine, 55(10). Lien externe

Neumann, A., Hajji, A., Rekik, M., & Pellerin, R. (juin 2022). A Two-Level Optimization Approach For Engineer-To-Order Project Scheduling [Résumé]. 10th IFAC Triennial Conference on Manufacturing Modelling, Management and Control (MIM 2022), Nantes, France. Publié dans IFAC PapersOnLine, 55(10). Lien externe

Neumann, A., Hajji, A., Rekik, M., & Pellerin, R. (2022). Integrated planning and scheduling of engineer-to-order projects using a Lamarckian layered genetic algorithm. (Rapport technique n° CIRRELT-2022-35). Non disponible

Neumann, A., Hajji, A., Rekik, M., & Pellerin, R. (2022). A model for advanced planning systems dedicated to the Engineer-To-Order context. International Journal of Production Economics, 252, 16 pages. Lien externe

P

Perrier, N., Hajji, A., Berthaut, F., & Pellerin, R. (2018). A path relinking-based scatter search for the resource-constrained project scheduling problem. International Journal of Project Organisation and Management, 10(1), 35 pages. Lien externe

Pellerin, R., Lemieux, A.-A., Hajji, A., Léger, P.-M., & Babin, G. (2012). Analyzing and optimizing an ERP segmentation pricing strategy under diffusion patterns. Information and Communication Technologies for the Advanced Enterprises : An International Journal, 2, 13-30. Non disponible

S

Saenz de Ugarte, B., Hajji, A., Pellerin, R., & Artiba, A. (2009). Development and integration of a reactive real-time decision support system in the aluminum industry. Engineering Applications of Artificial Intelligence, 22(6), 897-905. Lien externe

Liste produite: Thu Oct 15 07:41:41 2026 EDT.