Optimal Resource-Constraint Project Scheduling with Overlapping Modes

François Berthaut, Lucas Grèze, Robert Pellerin, Nathalie Perrier and Adnène Hajji

Technical Report (2011)

An external link is available for this item
Department: Department of Mathematics and Industrial Engineering
Research Center: CIRRELT - Interuniversity Research Centre on Enterprise Networks, Logistics and Transportation
PolyPublie URL: https://publications.polymtl.ca/51236/
Report number: CIRRELT-2011-09
Official URL: https://www.cirrelt.ca/documentstravail/cirrelt-20...
Date Deposited: 18 Apr 2023 15:11
Last Modified: 05 Apr 2024 11:55
Cite in APA 7: Berthaut, F., Grèze, L., Pellerin, R., Perrier, N., & Hajji, A. (2011). Optimal Resource-Constraint Project Scheduling with Overlapping Modes. (Technical Report n° CIRRELT-2011-09). https://www.cirrelt.ca/documentstravail/cirrelt-2011-09.pdf