François Berthaut, Robert Pellerin, Nathalie Perrier and Adnène Hajji
Technical Report (2011)
An external link is available for this item| Department: | Department of Mathematics and Industrial Engineering |
|---|---|
| Research Center: | CIRRELT - Interuniversity Research Centre on Enterprise Networks, Logistics and Transportation |
| PolyPublie URL: | https://publications.polymtl.ca/51237/ |
| Report number: | CIRRELT-2011-10 |
| Official URL: | https://www.cirrelt.ca/documentstravail/cirrelt-20... |
| Date Deposited: | 18 Apr 2023 15:11 |
| Last Modified: | 25 Sep 2024 16:41 |
| Cite in APA 7: | Berthaut, F., Pellerin, R., Perrier, N., & Hajji, A. (2011). Time-cost trade-offs in resource-constraint project scheduling problems with overlapping modes. (Technical Report n° CIRRELT-2011-10). https://www.cirrelt.ca/documentstravail/cirrelt-2011-10.pdf |
|---|---|