<  Back to the Polytechnique Montréal portal

Items where Author is "Dessevre, Guillaume"

Up a level
Export as [feed] Atom [feed] RSS 1.0 [feed] RSS 2.0
Jump to: A | D
Number of items: 8.

A

Azzamouri, A., Baptiste, P., Pellerin, R., & Dessevre, G. (2022). Impact of the continuous and periodic assessment of a buffer replenishment on the DDMRP method. International Journal of Production Research, 61(16), 5637-5658. External link

Azzamouri, A., Baptiste, P., Dessevre, G., & Pellerin, R. (2021). Demand Driven Material Requirements Planning (DDMRP): A systematic review and classification. Journal of Industrial Engineering and Management, 14(3), 18 pages. External link

D

Dessevre, G., Lamothe, J., Pellerin, R., Ben Ali, M., Baptiste, P., & Pomponne, V. (2023). Comparison of pull management policies for a divergent process with DDMRP buffers: an industrial case study. International Journal of Production Research, 21 pages. External link

Dessevre, G., Baptiste, P., Lamothe, J., & Pellerin, R. (2023). Visual charts produced by simulation to correlate service rate, resource utilization and DDMRP parameters. International Journal of Production Research, 61(3), 741-753. External link

Dessevre, G. (2021). Contrôle du paramètre Decoupled Lead Time (DLT) et des temps de réponse dans un système piloté en DDMRP [Ph.D. thesis, Polytechnique Montréal]. Available

Dessevre, G., Lamothe, J., Pomponne, V., Baptiste, P., Lauras, M., & Pellerin, R. (2020, April). A DDMRP implementation user feedbacks and stakes analysis [Paper]. 8th International Conference on Information Systems, Logistics and Supply Chain: Interconnected Supply Chains in an Era of Innovation (ILS 2020), Austin, TX. Unavailable

Dessevre, G., & Ben Ali, M. (2020, November). Modélisation et simulation d'un module d'ajustement de la capacité d'un système DDMRP [Paper]. 13ème Conférence Francophone de Modélisation, Optimisation et Simulation (MOSIM2020), Agadir, Maroc. Unavailable

Dessevre, G., Martin, G., Baptiste, P., Lamothe, J., Pellerin, R., & Lauras, M. (2019, September). Decoupled Lead Time in finite capacity flowshop: a feedback loop approach [Paper]. International Conference on Industrial Engineering and Systems Management (IESM 2019), Shanghai, China (6 pages). External link

List generated on: Mon Dec 4 07:53:57 2023 EST