Guillaume Dessevre, Guillaume Martin, Pierre Baptiste, Jacques Lamothe, Robert Pellerin
and Matthieu Lauras
Paper (2019)
An external link is available for this itemDepartment: | Department of Mathematics and Industrial Engineering |
---|---|
ISBN: | 9781728115665 |
PolyPublie URL: | https://publications.polymtl.ca/44404/ |
Conference Title: | International Conference on Industrial Engineering and Systems Management (IESM 2019) |
Conference Location: | Shanghai, China |
Conference Date(s): | 2019-09-25 - 2019-09-27 |
Publisher: | IEEE |
DOI: | 10.1109/iesm45758.2019.8948198 |
Official URL: | https://doi.org/10.1109/iesm45758.2019.8948198 |
Date Deposited: | 18 Apr 2023 15:01 |
Last Modified: | 08 Apr 2025 12:23 |
Cite in APA 7: | Dessevre, G., Martin, G., Baptiste, P., Lamothe, J., Pellerin, R., & Lauras, M. (2019, September). Decoupled Lead Time in finite capacity flowshop: a feedback loop approach [Paper]. International Conference on Industrial Engineering and Systems Management (IESM 2019), Shanghai, China (6 pages). https://doi.org/10.1109/iesm45758.2019.8948198 |
---|---|
Statistics
Dimensions