![]() | Monter d'un niveau |
Boukas, E.-K., Yang, H., & Zhang, Q. (1995). Minimax production planning in failure-prone manufacturing systems. Journal of Optimization Theory and Applications, 87(2), 269-286. Lien externe
Hansen, P., Jaumard, B., & Krau, S. (1995). An algorithm for Weber's problem on the sphere. Location Science, 3(4), 217-237. Lien externe
Audet, C., Hansen, P., Jaumard, B., & Savard, G. (1995). Links Between the Linear Bilevel and Mixed 0-1 Programming Problems. (Rapport technique n° G-95-20). Lien externe
Boukas, E.-K., Zhu, Q., & Malhamé, R. P. (1995). Expected Reachability for Piecewise Deterministic Linear Markov Processes. (Rapport technique n° G-95-17). Lien externe
Chamberland, S., Marcotte, O., & Sanso, B. (1995). On the Joint Topological, Dimensioning and Location Problem for Broadband Networks. (Rapport technique n° G-95-50). Lien externe
Chraim, J., & Sanso, B. (1995). Solving Very Large Airline Planning Problems: A Parallel Column Generation Approach. (Rapport technique n° G-95-52). Lien externe
Delmaire, H., Langevin, A., & Riopel, D. (1995). Le problème de design d'implantation d'usine : une revue. (Rapport technique n° G-95-09). Lien externe
Desaulniers, G., Desrosiers, J., Dumas, Y., Solomon, M. M., & Soumis, F. (1995). Daily Aircraft Routing and Scheduling. (Rapport technique n° G-94-21). Lien externe
Desrosiers, J., Lasry, A., Mcinnis, D., Solomon, M. M., & Soumis, F. (1995). ALTITUDE: The Airline Operations Management System at Air Transat. (Rapport technique n° G-95-23). Lien externe
Gendreau, M., Marcotte, P., & Savard, G. (1995). A Hybrid Tabu-Ascent Algorithm for the Linear Bilevel Programming Problem. (Rapport technique n° G-95-01). Lien externe
Gendreau, M., Sanso, B., & Stanford, D. A. (1995). Optimizing Routing in Packet-switched Networks with Non-Poisson Offered Traffic. (Rapport technique n° G-94-09). Lien externe
Hansen, P., Hertz, A., & Quinodoz, N. (1995). Splitting Trees. (Rapport technique n° G-95-42). Lien externe
Jaumard, B., Savard, G., & Xiong, J. (1995). An Exact Algorithm for Convex Bilevel Programming. (Rapport technique n° G-95-33). Lien externe
Laporte, G., Lopes, L., & Soumis, F. (1995). Optimal Sequencing Rules for Some Large Scale Flexible Manufacturing Problems Under Four Different Metrics. (Rapport technique n° G-95-25). Lien externe
Lavoie, S., Desrosiers, J., Dumas, Y., Solomon, M. M., & Soumis, F. (1995). An Optimizer for Aircraft and Crew Scheduling. (Rapport technique n° G-94-23). Lien externe
Montulet, P., Langevin, A., & Riopel, D. (1995). Entreposage : méthodes de rangement. (Rapport technique n° G-95-18). Lien externe
Montulet, P., Langevin, A., & Riopel, D. (1995). Le problème de l'optimisation de l'entreposage partagé : méthodes exactes et heuristiques. (Rapport technique n° G-95-28). Lien externe
Hansen, P., Jaumard, B., & Poggi de Aragao, M. Boole's conditions of possible experience and reasoning under uncertainty [Communication écrite]. 6th and 7th Advanced Research Institutes in Discrete Applied Mathematics (ARIDAM VI/VII), Rutgers University. Publié dans Discrete Applied Mathematics, 60(1-3). Lien externe
Sanso, B., & Girard, P. (avril 1995). Train scheduling desynchronization and power peak optimization in a subway system [Communication écrite]. IEEE/ASME Joint Railroad Conference, Baltimore, MD, USA. Lien externe
Desrosiers, J., Dumas, Y., Solomon, M. M., & Soumis, F. (1995). Time constrained routing and scheduling. Dans Ball, M. O. (édit.), Network routing (Vol. 8, p. 35-139). Lien externe