<  Retour au portail Polytechnique Montréal

Documents dont l'auteur est "Rekik, Monia"

Monter d'un niveau
Pour citer ou exporter [feed] Atom [feed] RSS 1.0 [feed] RSS 2.0
Nombre de documents: 15

Neumann, A., Hajji, A., Rekik, M., & Pellerin, R. (2024). Integrated planning and scheduling of engineer-to-order projects using a Lamarckian Layered Genetic Algorithm. International Journal of Production Economics, 267, 109077 (17 pages). Lien externe

Neumann, A., Hajji, A., Rekik, M., & Pellerin, R. (2023). Genetic algorithms for planning and scheduling engineer-to-order production: a systematic review. International Journal of Production Research, 30 pages. Lien externe

Neumann, A., Rekik, M., Morin, M., Hajji, A., & Pellerin, R. (juin 2023). Ordonnancement dynamique et contrôle intelligent d'un robot industriel [Communication écrite]. CIGI Qualita MOSIM 2023, Trois-Rivières, Qc, Canada. Lien externe

Neumann, A., Hajji, A., Rekik, M., & Pellerin, R. (juin 2022). A Didactic Review On Genetic Algorithms For Industrial Planning And Scheduling Problems [Résumé]. 10th IFAC Triennial Conference on Manufacturing Modelling, Management and Control (MIM 2022), Nantes, France. Publié dans IFAC PapersOnLine, 55(10). Lien externe

Hammami, F., Rekik, M., & Coelho, L. C. (2022). An exact method for the combinatorial bids generation problem with uncertainty on clearing prices, bids success, and contracts materialization. Computers and Operations Research, 148, 15 pages. Lien externe

Neumann, A., Hajji, A., Rekik, M., & Pellerin, R. (2022). Integrated planning and scheduling of engineer-to-order projects using a Lamarckian layered genetic algorithm. (Rapport technique n° CIRRELT-2022-35). Non disponible

Neumann, A., Hajji, A., Rekik, M., & Pellerin, R. (2022). A model for advanced planning systems dedicated to the Engineer-To-Order context. International Journal of Production Economics, 252, 16 pages. Lien externe

Neumann, A., Hajji, A., Rekik, M., & Pellerin, R. (juin 2022). A Two-Level Optimization Approach For Engineer-To-Order Project Scheduling [Résumé]. 10th IFAC Triennial Conference on Manufacturing Modelling, Management and Control (MIM 2022), Nantes, France. Publié dans IFAC PapersOnLine, 55(10). Lien externe

Dahmen, S., Rekik, M., Soumis, F., & Desaulniers, G. (2020). A two-stage solution approach for personalized multi-department multi-day shift scheduling. European Journal of Operational Research, 280(3), 1051-1063. Lien externe

Remli, N., Amrouss, A., El Hallaoui, I., & Rekik, M. (2019). A robust optimization approach for the winner determination problem with uncertainty on shipment volumes and carriers' capacity. Transportation Research Part B: Methodological, 123, 127-148. Lien externe

Dahmen, S., Rekik, M., & Soumis, F. (2018). An implicit model for multi-activity shift scheduling problems. Journal of Scheduling, 21(3), 285-304. Lien externe

Rekik, M., Cordeau, J.-F., & Soumis, F. (2010). Implicit shift scheduling with multiple breaks and work stretch duration restrictions. Journal of Scheduling, 13(1), 49-75. Lien externe

Crainic, T. G., Gendreau, M., Rekik, M., & Robert, J. (2009). Cost allocations in combinatorial auctions for bilateral procurement markets. (Rapport technique n° CIRRELT-2009-59). Lien externe

Abrache, J., Crainic, T. G., Gendreau, M., & Rekik, M. (2007). Combinatorial auctions. (Document de travail n° CIRRELT-2007-02). Lien externe

Rekik, M. (2006). Construction d'horaires de travail dans des environnements hautement flexibles [Thèse de doctorat, École Polytechnique de Montréal]. Disponible

Liste produite: Fri Dec 20 05:00:55 2024 EST.