<  Back to the Polytechnique Montréal portal

Items where Author is "Ouellette, Pierre"

Up a level
Export as [feed] Atom [feed] RSS 1.0 [feed] RSS 2.0
Group by: Authors | Publication Date | Document subtype | No Grouping
Number of items: 5.

Bilodeau, D., Cremieux, P.-Y., Jaumard, B., Ouellette, P., & Vovor, T. (2004). Measuring Hospital Performance in the Presence of Quasi-Fixed Inputs: an Analysis of Québec Hospitals. Journal of Productivity Analysis, 21(2), 183-199. External link

Ouellette, P., Leblanc, D., El‐Jabi, N., & Rousselle, J. (1988). Cost‐Benefit Analysis of Flood‐Plain Zoning. Journal of Water Resources Planning and Management, 114(3), 326-334. External link

Ouellette, P. (1987). Cost-benefit analysis of flood plain zoning. (Technical Report n° EPM-RT-87-10). Restricted access

Leblanc, D., & Ouellette, P. (1986). A probalistic benefit-cost analysis of a zoning program for flood plains. (Technical Report n° EPM-RT-86-55). Available

Ouellette, P., El‐Jabi, N., & Rousselle, J. (1985). Application of Extreme Value Theory to Flood Damage. Journal of Water Resources Planning and Management, 111(4), 467-477. External link

List generated on: Wed Oct 9 08:00:54 2024 EDT