<  Back to the Polytechnique Montréal portal

A probabilistic benefit-cost analysis of a zoning program for flood plains

Daniel Leblanc and Pierre Ouellette

Technical Report (1986)

Open Acess document in PolyPublie and at official publisher
[img]
Preview
Open Access to the full text of this document
Published Version
Terms of Use: All rights reserved
Download (580kB)
Show abstract
Hide abstract

Abstract

Expected value and variance of the benefit-cost ratio and probability of the program being profitable -- Application of the model to the outaouais regional community zoning program.

Uncontrolled Keywords

Department: Department of Mathematics and Industrial Engineering
PolyPublie URL: https://publications.polymtl.ca/9498/
Report number: EPM-RT-86-55
Date Deposited: 22 Nov 2021 16:36
Last Modified: 22 Oct 2024 08:30
Cite in APA 7: Leblanc, D., & Ouellette, P. (1986). A probabilistic benefit-cost analysis of a zoning program for flood plains. (Technical Report n° EPM-RT-86-55). https://publications.polymtl.ca/9498/

Statistics

Total downloads

Downloads per month in the last year

Origin of downloads

Repository Staff Only

View Item View Item