Daniel Leblanc and Pierre Ouellette
Technical Report (1986)
|
Open Access to the full text of this document Published Version Terms of Use: All rights reserved Download (580kB) |
Show abstract
Hide abstract
Abstract
Expected value and variance of the benefit-cost ratio and probability of the program being profitable -- Application of the model to the outaouais regional community zoning program.
Uncontrolled Keywords
Department: | Department of Mathematics and Industrial Engineering |
---|---|
PolyPublie URL: | https://publications.polymtl.ca/9498/ |
Report number: | EPM-RT-86-55 |
Date Deposited: | 22 Nov 2021 16:36 |
Last Modified: | 22 Oct 2024 08:30 |
Cite in APA 7: | Leblanc, D., & Ouellette, P. (1986). A probabilistic benefit-cost analysis of a zoning program for flood plains. (Technical Report n° EPM-RT-86-55). https://publications.polymtl.ca/9498/ |
---|---|
Statistics
Total downloads
Downloads per month in the last year
Origin of downloads