Up a level |
Bilodeau, D., Cremieux, P.-Y., Jaumard, B., Ouellette, P., & Vovor, T. (2004). Measuring Hospital Performance in the Presence of Quasi-Fixed Inputs: an Analysis of Québec Hospitals. Journal of Productivity Analysis, 21(2), 183-199. External link
Ouellette, P., Leblanc, D., El‐Jabi, N., & Rousselle, J. (1988). Cost‐Benefit Analysis of Flood‐Plain Zoning. Journal of Water Resources Planning and Management, 114(3), 326-334. External link
Ouellette, P. (1987). Cost-benefit analysis of flood plain zoning. (Technical Report n° EPM-RT-87-10). Restricted access
Leblanc, D., & Ouellette, P. (1986). A probalistic benefit-cost analysis of a zoning program for flood plains. (Technical Report n° EPM-RT-86-55). Available
Ouellette, P., El‐Jabi, N., & Rousselle, J. (1985). Application of Extreme Value Theory to Flood Damage. Journal of Water Resources Planning and Management, 111(4), 467-477. External link