Up a level |
Greze, L., Pellerin, R., Leclaire, P., & Perrier, N. (2014). CIGI2011: A heuristic method for resource-constrained project scheduling with activity overlapping. Journal of Intelligent Manufacturing, 25(4), 797-811. External link
Grèze, L., Pellerin, R., Leclaire, P., & Perrier, N. (2012). A Heuristic Method for Resource-Constrained Project Scheduling with Activity Overlapping. (Technical Report n° CIRRELT-2012-75). External link
Grèze, L., Pellerin, R., Leclaire, P., & Perrier, N. (2012). Une méthode heuristique pour l'ordonnancement de projets avec contraintes de ressources et chevauchement d'activités. (Technical Report n° CIRRELT-2012-18). External link
Grèze, L., Pellerin, R., Perrier, N., & Leclaire, P. (2011). Evaluating the effectiveness of task overlapping as a risk response strategy in engineering projects. (Technical Report n° CIRRELT-2011-11). External link