CIGI2011: A heuristic method for resource-constrained project scheduling with activity overlapping

Lucas Greze, Robert Pellerin, Patrice Leclaire and Nathalie Perrier

Article (2014)

An external link is available for this item
Department: Department of Mathematics and Industrial Engineering
PolyPublie URL: https://publications.polymtl.ca/12275/
Journal Title: Journal of Intelligent Manufacturing (vol. 25, no. 4)
Publisher: Springer
DOI: 10.1007/s10845-012-0719-5
Official URL: https://doi.org/10.1007/s10845-012-0719-5
Date Deposited: 18 Apr 2023 15:08
Last Modified: 05 Apr 2024 10:51
Cite in APA 7: Greze, L., Pellerin, R., Leclaire, P., & Perrier, N. (2014). CIGI2011: A heuristic method for resource-constrained project scheduling with activity overlapping. Journal of Intelligent Manufacturing, 25(4), 797-811. https://doi.org/10.1007/s10845-012-0719-5