Lucas Grèze, Robert Pellerin, Patrice Leclaire and Nathalie Perrier
Article (2014)
An external link is available for this item| Department: | Department of Mathematics and Industrial Engineering |
|---|---|
| PolyPublie URL: | https://publications.polymtl.ca/12275/ |
| Journal Title: | Journal of Intelligent Manufacturing (vol. 25, no. 4) |
| Publisher: | Springer |
| DOI: | 10.1007/s10845-012-0719-5 |
| Official URL: | https://doi.org/10.1007/s10845-012-0719-5 |
| Date Deposited: | 18 Apr 2023 15:08 |
| Last Modified: | 08 Apr 2025 01:39 |
| Cite in APA 7: | Grèze, L., Pellerin, R., Leclaire, P., & Perrier, N. (2014). CIGI2011: A heuristic method for resource-constrained project scheduling with activity overlapping. Journal of Intelligent Manufacturing, 25(4), 797-811. https://doi.org/10.1007/s10845-012-0719-5 |
|---|---|
Statistics
Dimensions
