Lucas Greze, Robert Pellerin, Patrice Leclaire and Nathalie Perrier
Article (2014)
An external link is available for this itemDepartment: | Department of Mathematics and Industrial Engineering |
---|---|
PolyPublie URL: | https://publications.polymtl.ca/12275/ |
Journal Title: | Journal of Intelligent Manufacturing (vol. 25, no. 4) |
Publisher: | Springer |
DOI: | 10.1007/s10845-012-0719-5 |
Official URL: | https://doi.org/10.1007/s10845-012-0719-5 |
Date Deposited: | 18 Apr 2023 15:08 |
Last Modified: | 05 Apr 2024 10:51 |
Cite in APA 7: | Greze, L., Pellerin, R., Leclaire, P., & Perrier, N. (2014). CIGI2011: A heuristic method for resource-constrained project scheduling with activity overlapping. Journal of Intelligent Manufacturing, 25(4), 797-811. https://doi.org/10.1007/s10845-012-0719-5 |
---|---|
Statistics
Dimensions