Lucas Grèze, Robert Pellerin, Patrice Leclaire and Nathalie Perrier
Technical Report (2012)
An external link is available for this item| Department: | Department of Mathematics and Industrial Engineering |
|---|---|
| Research Center: | CIRRELT - Interuniversity Research Centre on Enterprise Networks, Logistics and Transportation |
| PolyPublie URL: | https://publications.polymtl.ca/51242/ |
| Report number: | CIRRELT-2012-75 |
| Official URL: | https://www.cirrelt.ca/documentstravail/cirrelt-20... |
| Date Deposited: | 18 Apr 2023 15:11 |
| Last Modified: | 25 Sep 2024 16:41 |
| Cite in APA 7: | Grèze, L., Pellerin, R., Leclaire, P., & Perrier, N. (2012). A Heuristic Method for Resource-Constrained Project Scheduling with Activity Overlapping. (Technical Report n° CIRRELT-2012-75). https://www.cirrelt.ca/documentstravail/cirrelt-2012-75.pdf |
|---|---|
Statistics
Stats are not available on this system.
