<  Retour au portail Polytechnique Montréal

Documents dont l'auteur est "Gharbi, Ali"

Monter d'un niveau
Pour citer ou exporter [feed] Atom [feed] RSS 1.0 [feed] RSS 2.0
Grouper par: Auteurs ou autrices | Date de publication | Sous-type de document | Aucun groupement
Aller à : B | H | P
Nombre de documents: 8

B

Bouslah, B., Gharbi, A., & Pellerin, R. (2018). Joint production, quality and maintenance control of a two-machine line subject to operation-dependent and quality-dependent failures. International Journal of Production Economics, 195(Supplement), 210-226. Lien externe

Bouslah, B., Gharbi, A., & Pellerin, R. (2014). Joint production and quality control of unreliable batch manufacturing systems with rectifying inspection. International Journal of Production Research, 52(14), 4103-4117. Lien externe

Bouslah, B., Gharbi, A., & Pellerin, R. (2013). Joint optimal lot sizing and production control policy in an unreliable and imperfect manufacturing system. International Journal of Production Economics, 144(1), 143-156. Lien externe

H

Hajji, A., Pellerin, R., Gharbi, A., Léger, P.-M., & Babin, G. (2016). Toward valuable prediction of ERP diffusion in North American automotive industry: A simulation based approach. International Journal of Production Economics, 175, 61-70. Lien externe

Hajji, A., Gharbi, A., Kenne, J.-P., & Pellerin, R. (2011). Production control and replenishment strategy with multiple suppliers. European Journal of Operational Research, 208(1), 67-74. Lien externe

P

Pellerin, R., & Gharbi, A. (2009). Production control of hybrid repair and remanufacturing systems under general conditions. Journal of Quality in Maintenance Engineering, 15(4), 383-396. Lien externe

Pellerin, R., Sadr, J., Gharbi, A., & Malhamé, R. P. (2009). A production rate control policy for stochastic repair and remanufacturing systems. International Journal of Production Economics, 121(1), 39-48. Lien externe

Pellerin, R., Boulet, J.-F., Gharbi, A., & Kenné, J.-P. (2007). Développement d'une politique intégrée de contrôle des taux de production et de maintenance corrective avec diagnostic. INFOR, 45(4), 197-207. Lien externe

Liste produite: Thu Mar 28 04:41:34 2024 EDT.