Bassem Bouslah, Ali Gharbi and Robert Pellerin
Article (2013)
An external link is available for this itemDepartment: | Department of Mathematics and Industrial Engineering |
---|---|
Research Center: | CIRODD - Centre interdisciplinaire de recherche sur l'opérationnalisation du développement durable |
PolyPublie URL: | https://publications.polymtl.ca/14204/ |
Journal Title: | International Journal of Production Economics (vol. 144, no. 1) |
Publisher: | Elsevier |
DOI: | 10.1016/j.ijpe.2013.01.031 |
Official URL: | https://doi.org/10.1016/j.ijpe.2013.01.031 |
Date Deposited: | 18 Apr 2023 15:09 |
Last Modified: | 25 Sep 2024 15:51 |
Cite in APA 7: | Bouslah, B., Gharbi, A., & Pellerin, R. (2013). Joint optimal lot sizing and production control policy in an unreliable and imperfect manufacturing system. International Journal of Production Economics, 144(1), 143-156. https://doi.org/10.1016/j.ijpe.2013.01.031 |
---|---|
Statistics
Dimensions