<  Retour au portail Polytechnique Montréal

A Multi-stage methodology for long-term open-pit mine production planning under ore grade uncertainty

Enrique Jélvez, Julián M. Ortiz, Nelson Morales, Hooman Askari-Nasab et Gonzalo Nelis

Article de revue (2023)

Document en libre accès dans PolyPublie et chez l'éditeur officiel
[img]
Affichage préliminaire
Libre accès au plein texte de ce document
Version officielle de l'éditeur
Conditions d'utilisation: Creative Commons: Attribution (CC BY)
Télécharger (3MB)
Afficher le résumé
Cacher le résumé

Abstract

The strategic planning of open pit operations defines the best strategy for extraction of the mineral deposit to maximize the net present value. The process of strategic planning must deal with several sources of uncertainty; therefore, many authors have proposed models to incorporate it at each of its stages: Computation of the ultimate pit, optimization of pushbacks, and production scheduling. However, most works address it at each level independently, with few aiming at the whole process. In this work, we propose a methodology based on new mathematical optimization models and the application of conditional simulation of the deposit for addressing the geological uncertainty at all stages. We test the method in a real case study and evaluate whether incorporating uncertainty increases the quality of the solutions. Moreover, we benefit from our integrated framework to evaluate the relative impact of uncertainty at each stage. This could be used by decision-makers as a guide for detecting risks and focusing efforts.

Mots clés

geological uncertainty; geostatistics; open-pit mine production planning; surface mining; stochastic mixed-integer linear programming; uncertainty assessment

Sujet(s): 1400 Génie minier et minéral > 1400 Génie minier et minéral
Département: Département des génies civil, géologique et des mines
Organismes subventionnaires: Chilean National Research and Development Agency (ANID) - Programs PIA/Basal, FONDECYT Iniciación
Numéro de subvention: AFB180004, AFB220002, 11221352, 11230022
URL de PolyPublie: https://publications.polymtl.ca/56694/
Titre de la revue: Mathematics (vol. 11, no 18)
Maison d'édition: Multidisciplinary Digital Publishing Institute
DOI: 10.3390/math11183907
URL officielle: https://doi.org/10.3390/math11183907
Date du dépôt: 23 janv. 2024 15:48
Dernière modification: 01 oct. 2024 00:17
Citer en APA 7: Jélvez, E., Ortiz, J. M., Morales, N., Askari-Nasab, H., & Nelis, G. (2023). A Multi-stage methodology for long-term open-pit mine production planning under ore grade uncertainty. Mathematics, 11(18), 3907 (19 pages). https://doi.org/10.3390/math11183907

Statistiques

Total des téléchargements à partir de PolyPublie

Téléchargements par année

Provenance des téléchargements

Dimensions

Actions réservées au personnel

Afficher document Afficher document