Master's thesis (2013)
Abstract
A forward modeling and an inversion code have been developed to study the use of the borehole gravity method for exploration of volcanogenic massif sulphides (VMS) deposits in the Abitibi region of Quebec. Two problems are associated with the gravity method: acquiring data can be a long and costly method in the context where there is a limited quantity of boreholes and the separation of the response caused by the immediate or local geology and the response of deeper and farther formations called the regional. The principal objective of this master's project is to analyse those two major problems by modelling and inverting synthetic data. The specific objectives are the optimisation of the data acquisition settings and the regional-residual anomaly separation. The forward modeling method is based on the prismatic method described by Li and Chouteau (1998). A stochastic approach developed by Shamsipour et al. (2010) is chosen for the inversion and was adapted for borehole data. A density model of a typical VMS ore deposit was designed based on a number of well-known mines in the region of Rouyn-Noranda, Val-d'Or and Matagami. The data acquisition settings include the number of boreholes, their location and data collection sampling in the boreholes. Since the borehole gravity method is a costly geophysics method, it is best to know well the influence of the data acquisition settings to be able to optimise them. A minimum of three boreholes within appropriate distance from the target is required to locate any structure. When four boreholes situated at the detectability range of the deposit are used, it can be located with precision. In the scenario where the borehole gravity method is used to calculate the excess mass of a deposit and to define its structure, at least four boreholes should be used with one intercepting the deposit and fixed densities or gradient constraints must be applied. A 10m sampling interval is recommended. If the position of the deposit is known, a good compromise is to use a larger interval far from the deposit and use a 10m interval when the borehole is closer to the deposit.
Statistics
Total downloads
Downloads per month in the last year
Origin of downloads
