<  Retour au portail Polytechnique Montréal

Documents publiés en "2019"

Monter d'un niveau
Pour citer ou exporter [feed] Atom [feed] RSS 1.0 [feed] RSS 2.0
Grouper par: Auteurs ou autrices | Département | Sous-type de document | Aucun groupement
Aller à : A | E | G | J | M | N | O | R
Nombre de documents: 13

A

Amaya, J., Molina, E., Morales, N., & Uribe, P. (juin 2019). Optimization model for rostering and crew assignment for train transportation [Communication écrite]. 39th International Symposium on Application of Computers and Operations Research in the Mineral Industry (APCOM 2019), Wroclaw, Poland. Lien externe

E

Espejo, N., Morales, N., & Nancel-Penard, P. (2019). A methodology for automatic ramp design in open pit mines. Journal of Mining Engineering & Research, 1(2), 87-93. Lien externe

Espejo, N., Nancel-Penard, P., & Morales, N. (juin 2019). A procedure to generate optimized ramp designs using mathematical programming [Communication écrite]. 39th International Symposium on Application of Computers and Operations Research in the Mineral Industry (APCOM 2019), Wroclaw, Poland. Lien externe

G

González, H., Morales, N., & Manríquez, F. (août 2019). Loading equipment planning considering optimization and simulation for the fulfilment of a production plan in open pit mining [Communication écrite]. 6° Conferencia Internacional de Geología y Planificación Minera (Geomin-Mineplanning 2019), Santiago, Chile. Lien externe

González, J., & Morales, N. (août 2019). Simulation and optimization of bench-mining sequences using fully mobile in-pit sizer and conveyor systems [Communication écrite]. 6° Conferencia Internacional de Geología y Planificación Minera (Geomin-Mineplanning 2019), Santiago, Chile. Lien externe

J

Jélvez, E., Morales, N., & Ortiz, J. M. (décembre 2019). Impact of geological uncertainty at different stages of the open-pit mine production planning process [Communication écrite]. 28th International Symposium on Mine Planning and Equipment Selection (MPES 2019), Perth, Australia. Lien externe

M

Manríquez, F., González, H., & Morales, N. (juin 2019). Short-term open-pit mine production scheduling with hierarchical objectives [Communication écrite]. 39th International Symposium on Application of Computers and Operations Research in the Mineral Industry (APCOM 2019), Wroclaw, Poland. Lien externe

Montané, S., Nancel-Penard, P., & Morales, N. (décembre 2019). Optimization and sequencing a semiautomated ramp design in underground mining: a case study [Communication écrite]. 28th International Symposium on Mine Planning and Equipment Selection (MPES 2019), Perth, Australia. Lien externe

Morales, N., Seguel, S., Cáceres, A., Jélvez, E., & Alarcón, M. (2019). Incorporation of geometallurgical attributes and geological uncertainty into long-term open-pit mine planning. Minerals, 9(2), 26-26. Lien externe

N

Nancel-Penard, P., Parra, A., Morales, N., Diaz, C., & Widzyk-Capehart, E. (2019). Value-optimal design of ramps in open pit mining. Archives of Mining Sciences, 64(2), 399-413. Lien externe

Nelis, G., Morales, N., & Ortíz, J. (juin 2019). Performance assessment of antithetic random fields in a stochastic mine planning model [Communication écrite]. 39th International Symposium on Application of Computers and Operations Research in the Mineral Industry (APCOM 2019), Wroclaw, Poland. Lien externe

O

Orellana, F., Morales, N., & Jelvez, E. (2019). Modelo integrado de simulación y optimización para planes mineros de corto plazo en minería a cielo abierto. Journal of Mining Engineering & Research, 1(2), 150-158. Lien externe

R

Rojas, V., González, T., & Morales, N. (août 2019). Optimization of an annual mining development plan using mathematical programming [Communication écrite]. 6° Conferencia Internacional de Geología y Planificación Minera (Geomin-Mineplanning 2019), Santiago, Chile. Lien externe

Liste produite: Sun Apr 28 02:19:13 2024 EDT.