<  Back to the Polytechnique Montréal portal

Optimization and sequencing a semiautomated ramp design in underground mining: a case study

Sergio Montané, Pierre Nancel-Penard and Nelson Morales

Paper (2019)

Document published while its authors were not affiliated with Polytechnique Montréal

An external link is available for this item
PolyPublie URL: https://publications.polymtl.ca/49338/
Conference Title: 28th International Symposium on Mine Planning and Equipment Selection (MPES 2019)
Conference Location: Perth, Australia
Conference Date(s): 2019-12-02 - 2019-12-04
Editors: Erkan Topal
Publisher: Springer-Verlag
DOI: 10.1007/978-3-030-33954-8_17
Official URL: https://doi.org/10.1007/978-3-030-33954-8_17
Date Deposited: 18 Apr 2023 15:02
Last Modified: 25 Sep 2024 16:38
Cite in APA 7: Montané, S., Nancel-Penard, P., & Morales, N. (2019, December). Optimization and sequencing a semiautomated ramp design in underground mining: a case study [Paper]. 28th International Symposium on Mine Planning and Equipment Selection (MPES 2019), Perth, Australia. https://doi.org/10.1007/978-3-030-33954-8_17

Statistics

Dimensions

Repository Staff Only

View Item View Item