Sergio Montané, Pierre Nancel-Penard and Nelson Morales
Paper (2019)
Document published while its authors were not affiliated with Polytechnique Montréal
An external link is available for this itemPolyPublie URL: | https://publications.polymtl.ca/49338/ |
---|---|
Conference Title: | 28th International Symposium on Mine Planning and Equipment Selection (MPES 2019) |
Conference Location: | Perth, Australia |
Conference Date(s): | 2019-12-02 - 2019-12-04 |
Editors: | Erkan Topal |
Publisher: | Springer-Verlag |
DOI: | 10.1007/978-3-030-33954-8_17 |
Official URL: | https://doi.org/10.1007/978-3-030-33954-8_17 |
Date Deposited: | 18 Apr 2023 15:02 |
Last Modified: | 25 Sep 2024 16:38 |
Cite in APA 7: | Montané, S., Nancel-Penard, P., & Morales, N. (2019, December). Optimization and sequencing a semiautomated ramp design in underground mining: a case study [Paper]. 28th International Symposium on Mine Planning and Equipment Selection (MPES 2019), Perth, Australia. https://doi.org/10.1007/978-3-030-33954-8_17 |
---|---|
Statistics
Dimensions