Monter d'un niveau |
Chen, L., Langevin, A., & Lu, Z. (2013). Integrated scheduling of crane handling and truck transportation in a maritime container terminal. European Journal of Operational Research, 225(1), 142-152. Lien externe
Ha, M. H., Bostel, N., Langevin, A., & Rousseau, L.-M. (2013). An exact algorithm and a metaheuristic for the multi-vehicle covering tour problem with a constraint on the number of vertices. European Journal of Operational Research, 226(2), 211-220. Lien externe
Monroy, I. M., Amaya, C. A., & Langevin, A. (2013). The Periodic Capacitated Arc Routing Problem With Irregular Services. Discrete Applied Mathematics, 161(4-5), 691-701. Lien externe
Perrier, N., Agard, B., Baptiste, P., Frayret, J.-M., Langevin, A., Pellerin, R., Riopel, D., & Trépanier, M. (2013). A survey of models and algorithms for emergency response logistics in electric distribution systems. Part I: Reliability planning with fault considerations. Computers & Operations Research, 40(7), 1895-1906. Lien externe
Perrier, N., Agard, B., Baptiste, P., Frayret, J.-M., Langevin, A., Pellerin, R., Riopel, D., & Trépanier, M. (2013). A survey of models and algorithms for emergency response logistics in electric distribution systems. Part II: Contingency planning level. Computers & Operations Research, 40(7), 1907-1922. Lien externe
Salazar-Aguilar, M. A., Langevin, A., & Laporte, G. (2013). The synchronized arc and node routing problem: Application to road marking. Computers & Operations Research, 40(7), 1708-1715. Lien externe
Malapert, A., Gueret, C., Cambazard, H., Jussien, N., Langevin, A., & Rousseau, L.-M. (juin 2013). An optimal constraint programming approach to the open-shop problem [Communication écrite]. 23rd International Conference on Automated Planning and Scheduling (ICAPS 2013), Rome, Italy. Publié dans Proceedings of the International Conference on Automated Planning and Scheduling, 23. Lien externe
Quirion-Blais, O., Trépanier, M., & Langevin, A. (juin 2013). Viabilité hivernale des réseaux routiers : prise en compte des contraintes opérationnelles dans la confection des circuits de déneigement [Communication écrite]. 10ème Congrès International de Génie Industriel - CIGI 2013, La Rochelle, France. Non disponible