Monter d'un niveau |
Allaoui, H., Iassinoski, S., Artiba, H., Benmassour, R., & Pellerin, R. (mai 2009). Simulation aided jointly scheduling n jobs and preventive maintenance on a single machine subject to breakdowns [Communication écrite]. International Conference on Industrial Engineering and Systems Management (IESM 2009), Montréal, Québec. Non disponible
Berthaut, F., Pellerin, R., & Gharbi, A. (2009). Control of a repair and overhaul system with probabilistic parts availability. Production Planning & Control, 20(1), 57-67. Lien externe
Berthaut, F., Pellerin, R., & Gharbi, A. (2009). Remanufacturing system control under unreliable supply of replacement parts. International Journal of Simulation and Process Modelling, 5(3), 205-214. Lien externe
Bourgault, M., Lefebvre, É., Lefebvre, L.-A., Pellerin, R., & Elia, E. (2009). Measuring performance of distributed projects: a proposed methodology. International Journal of Management and Enterprise Development, 6(2), 212-229. Lien externe
Cimon, Y., Poulin, D., Pellerin, R., Frayret, J.-M., & Karuranga, E. (mai 2009). The strategic role of information technology in the value creation process of small and medium enterprises : integrating business models, performance and assimilation [Communication écrite]. International Conference on Industrial Engineering and Systems Management (IESM 2009), Montréal, Québec. Non disponible
Compoare, A., Pellerin, R., & Bourgault, M. (juin 2009). Impact de sites multiples en contrôle de projet [Communication écrite]. 8e Congrès international de génie industriel (CIGI 2009), Tarbes, France. Non disponible
De Ugarte, B. S., Artiba, A., & Pellerin, R. (2009). Manufacturing execution system - A literature review. Production Planning & Control, 20(6), 525-539. Lien externe
de Ugarte, S., Pellerin, R., & Artiba, A. (mai 2009). Enhancing genetic algorithm with predator mechanisms for on-line optimization [Communication écrite]. International Conference on Industrial Engineering and Systems Management (IESM 2009), Montréal, Québec. Non disponible
Françoise, O., Bourgault, M., & Pellerin, R. (2009). ERP implementation by critical success factor management. Business Process Management Journal, 15(3), 371-394. Lien externe
Hadaya, P., & Pellerin, R. (2009). Determinants of Manufacturing Firms' Intent to Share Inventory Information with their key Suppliers. Dans Kock, N. (édit.), E-Collaboration: Concepts, Methodologies, Tools, and Applications (1267-1288). Lien externe
Hadaya, P., & Pellerin, R. (2009). Determinants of Manufacturing Firms' Intent to Use Web Based Systems to Share Inventory Information with their Key Suppliers. Dans E-Collaboration : Concepts, Methodologies, Tools and Applications (1267-1288). Lien externe
Hajji, A., Gharbi, A., Kenne, J. P., & Pellerin, R. (juin 2009). Production control and replenishment strategy with multiple suppliers [Communication écrite]. 8e Conférence internationale de génie industriel, Tarbes, France. Non disponible
Hajji, A., Pellerin, R., Gharbi, A., Léger, P. M., & Babin, G. (mai 2009). Dynamic pricing models for ERP systems under network externality [Communication écrite]. International Conference on Industrial Engineering and Systems Management (IESM 2009), Montréal, Québec. Non disponible
Kouki, R., Pellerin, R., & Poulin, D. (octobre 2009). Beyond ERP Implementation: an integrative framework for higher success [Communication écrite]. Conference on Enterprise Information Systems, Ofir, Portugual. Non disponible
Kouki, R., Poulin, D., & Pellerin, R. (2009). Determining factors of ERP assimilation: Exploratory findings from a developed and a developing country. (Rapport technique n° CIRRELT-2009-10). Lien externe
Kouki, R., Poulin, D., & Pellerin, R. (août 2009). Exploring ERP post-implementation success: findings from cases in a developed and a developing country [Communication écrite]. 20th International Conference on Production Research, Shanghai, China. Non disponible
Langevin, A., Perrier, N., Agard, B., Baptiste, P., Frayret, J.-M., Pellerin, R., Riopel, D., & Trépanier, M. (janvier 2009). Models and methods for emergency response logistics in electric distribution systems [Communication écrite]. 2nd International Workshop on Successful Strategies in Supply Chain Management, Hong Kong. Non disponible
Léger, P.-M., Babin, G., Robert, J., Pellerin, R., Cassivi, L., & Hadaya, P. (novembre 2009). Assessing the impact of supply chain integration through an ERP system [Communication écrite]. 9th International Conference on Electronic Business, Macau. Lien externe
Malki, Y., Pellerin, R., & Baptiste, P. (juin 2009). Déploiement logistique en situation de crise [Communication écrite]. 8e Congrès international de génie industriel (CIGI 2009), Tarbes, France. Non disponible
Mhada, F., Hajji, A., Malhamé, R. P., Pellerin, R., & Gharbi, A. (mai 2009). Production control of unreliable manufacturing systems producing defective items [Communication écrite]. International Conference on Industrial Engineering and Systems Management (IESM 2009), Montréal, Québec. Non disponible
Millaire, J.-F., Léger, P.-M., Babin, G., & Pellerin, R. (janvier 2009). The effect of network exposure on the diffusion of enterprise system [Communication écrite]. 42nd Annual Hawaii International Conference on System Sciences, Waikoloa, HI, United states. Non disponible
Muller, E., Pellerin, R., & Beacart, V. (juin 2009). Méthodologie d'évaluation durable de projet [Communication écrite]. 8e Conférence internationale de génie industriel, Tarbes, France. Non disponible
Muller, E., Pellerin, R., Margni, M., & Beacart, V. (mai 2009). Potential use of PLM and ERP as Environmental Data Sources for LCA : A prospective Literature Review [Communication écrite]. International Conference on Industrial Engineering and Systems Management (IESM 2009), Montréal, Québec. Non disponible
Njike, A., Pellerin, R., & Kenne, J. P. (mai 2009). Joint maintenance and production planning of manufacturing systems subject to defective products [Communication écrite]. International Conference on Industrial Engineering and Systems Management (IESM 2009), Montréal, Québec. Non disponible
Pellerin, R., & Gharbi, A. (2009). Production control of hybrid repair and remanufacturing systems under general conditions. Journal of Quality in Maintenance Engineering, 15(4), 383-396. Lien externe
Pellerin, R., Sadr, J., Gharbi, A., & Malhamé, R. P. (2009). A production rate control policy for stochastic repair and remanufacturing systems. International Journal of Production Economics, 121(1), 39-48. Lien externe
Pellerin, R., Sadr, J., Guevremont, M., & Rousseau, L.-M. (mai 2009). Planning of International Projects with Material Constraints [Communication écrite]. International Conference on Industrial Engineering and Systems Management (IESM 2009), Montréal, Québec. Non disponible
Pellerin, R., Trépanier, M., Montreuil, B., & Rousseau, J. M. (édit.) (2009). Proceedings of IESM 2009 Conference. Lien externe
Quintana, V., Rivest, L., Pellerin, R., & Venne, F. (mai 2009). Methodology for the implementation of the model-based definition approach [Communication écrite]. International Conference on Industrial Engineering and Systems Management (IESM 2009), Montréal, Québec. Non disponible
Quintana, V., Rivest, L., Tahan, A., Pellerin, R., & Venne, F. (juillet 2009). From fully dimensioned 2D drawings to reduced dimensioning 3D model-based definition [Communication écrite]. 6th International Conference on Product Lifecycle Management, Bath, UK. Non disponible
Saenz de Ugarte, B., Hajji, A., Pellerin, R., & Artiba, A. (2009). Development and integration of a reactive real-time decision support system in the aluminum industry. Engineering Applications of Artificial Intelligence, 22(6), 897-905. Lien externe
Sanchez, H., Robert, B., Bourgault, M., & Pellerin, R. (2009). Risk management applied to projects, programs, and portfolios. International Journal of Managing Projects in Business, 2(1), 14-35. Lien externe