H. Allaoui, S. Iassinoski, H. Artiba, R. Benmassour and Robert Pellerin
Paper (2009)
This item is not archived in PolyPublie| Department: | Department of Mathematics and Industrial Engineering |
|---|---|
| PolyPublie URL: | https://publications.polymtl.ca/20043/ |
| Conference Title: | International Conference on Industrial Engineering and Systems Management (IESM 2009) |
| Conference Location: | Montréal, Québec |
| Conference Date(s): | 2009-05-13 - 2009-05-15 |
| Date Deposited: | 18 Apr 2023 15:14 |
| Last Modified: | 25 Sep 2024 15:58 |
| Cite in APA 7: | Allaoui, H., Iassinoski, S., Artiba, H., Benmassour, R., & Pellerin, R. (2009, May). Simulation aided jointly scheduling n jobs and preventive maintenance on a single machine subject to breakdowns [Paper]. International Conference on Industrial Engineering and Systems Management (IESM 2009), Montréal, Québec. |
|---|---|
Statistics
Stats are not available on this system.
