![]() | Monter d'un niveau |
Desaulniers, G., Desrosiers, J., Dumas, Y., Marc, S., Rioux, B., Solomon, M. M., & Soumis, F. (1996). Crew Pairing at Air France. (Rapport technique n° G-93-39). Lien externe
Desaulniers, G., Lavigne, J., & Soumis, F. (1996). Multi-Depot Vehicle Scheduling Problems with Time Windows and Waiting Costs. (Rapport technique n° G-96-33). Lien externe
Desaulniers, G., Soumis, F., & Laurent, J.-C. (1996). A Shortest Path Algorithm for a Car-Like Robot in a Polygonal Environment. (Rapport technique n° G-95-43). Lien externe
Ioachim, I., Gélinas, E., Soumis, F., & Desrosiers, J. (1996). A Dynamic Programming Algorithm for the Shortest Path Problem with Time Windows and Linear Node Costs. (Rapport technique n° G-94-24). Lien externe
Montulet, P., Langevin, A., Riopel, D., & Soumis, F. (1996). Exact and heuristic methods to minimize the peak load of shared storage policies. (Rapport technique n° G-96-47). Lien externe
Ziarati, K., Soumis, F., Desrosiers, J., Gélinas, S., & Saintonge, A. (1996). Locomotive Assignment with Heterogeneous Consists at CN North America. (Rapport technique n° G-95-31). Lien externe