<  Back to the Polytechnique Montréal portal

Items where Author is "Rubio, Enrique"

Up a level
Export as [feed] Atom [feed] RSS 1.0 [feed] RSS 2.0
Jump to: A | M | P | R | S | V
Number of items: 15.

A

Alarcón, M., Madariaga, E., Morales, N., & Rubio, E. (2012, June). Integrating constructability of a project into the optimization of the production planning and scheduling [Paper]. 6th International Conference & Exhibition on Mass Mining: Advancing the State-of-the-Art in Mass Mining (MassMin 2012), Sudbury, Ont.. External link

Alpízar, M. J., Morales, N., Rubio, E., & Wiertz, J. (2011, June). Mine planning optimisation models to reduce diesel consumption of transport and arsenic emissions [Paper]. 2nd International Seminar on Mine Planning (MinePlanning 2011), Antofagasta, Chile. Unavailable

M

Morales, N., Rocher, W., Rubio, E., & Smoljanovic, M. (2011, July). Integrating constructability of a project into the optimization of production plans and schedules [Paper]. IFORS Conference on World OR : Global Economy and Sustainable Environment, Melbourne, Australia. Unavailable

Morales, N., & Rubio, E. (2011, March). Planificación minera de corto plazo para cielo abierto [Paper]. Primer Taller Internacional de Planificación Minera OVIMINE, Lima, Perú. Unavailable

Morales, N., & Rubio, E. (2010, June). Robust open-pit planning under geological uncertainty [Paper]. 4th International Conference on Mining Innovation (MININ 2010), Santiago, Chile. Unavailable

Morales, C., Morales, N., & Rubio, E. (2009, October). Short term mine planning model supporting geometallurgical operational blending [Paper]. INFORMS 2009, San Diego, Calif.. Unavailable

P

Peirano, F., Rubio, E., & Morales, N. (2011, June). Capacitated final pit definition [Paper]. 2nd International Seminar on Mine Planning (MinePlanning 2011), Antofagasta, Chile. Unavailable

R

Rocher, W., Smoljanovic, M., Rubio, E., & Morales, N. (2012, June). Optimal sequencing and scheduling for a block/panel cave mining [Paper]. 6th International Conference & Exhibition on Mass Mining: Advancing the State-of-the-Art in Mass Mining (MassMin 2012), Sudbury, Ont.. External link

Rocher, W., Rubio, E., & Morales, N. (2011, September). Eight-dimensional planning: Construction of an integrated model for mine planning involving constructability [Paper]. 35th APCOM Symposium, Wollongong, Australia. External link

Rocher, W., Rubio, E., & Morales, N. (2011, June). Underground development sequencer and scheduler considering constructability [Paper]. 2nd International Seminar on Mine Planning (MinePlanning 2011), Antofagasta, Chile. Unavailable

Rubio, E., Morales, N., Peirano, F., & Vargas, M. (2010, June). DELPHOS: Laboratorio de Planificación Minera [Paper]. 5o Seminario de Acercamiento Tecnológico, Calama, Chile. Unavailable

S

Smoljanovic, M., Rubio, E., & Morales, N. (2011, June). Block/Panel caving scheduling under precedence constraints [Paper]. 2nd International Seminar on Mine Planning (MinePlanning 2011), Antofagasta, Chile. Unavailable

Smoljanovic, M., Rubio, E., & Morales, N. (2011, September). Panel caving scheduling under precedence constraints considering mining system [Paper]. 35th APCOM Symposium, Wollongong, Australia. External link

V

Vargas, M., Rubio, E., & Morales, N. (2011, June). Optimal open-pit short-term planning under uncertainty and blending constraints [Paper]. 2nd International Seminar on Mine Planning (MinePlanning 2011), Antofagasta, Chile. Unavailable

Vargas, M., Morales, N., & Rubio, E. (2009, January). A short term mine planning model for open-pit mines with blending constraints [Paper]. MinePlanning 2009, Santiago, Chile. Unavailable

List generated on: Sun May 18 06:13:03 2025 EDT