<  Retour au portail Polytechnique Montréal

Documents dont l'auteur est "Mhada, Fatima Zahra"

Monter d'un niveau
Pour citer ou exporter [feed] Atom [feed] RSS 1.0 [feed] RSS 2.0
Grouper par: Auteurs ou autrices | Date de publication | Sous-type de document | Aucun groupement
Aller à : M | O
Nombre de documents: 11

M

Mhada, F. Z., Ouzineb, M., Pellerin, R., & El Hallaoui, I. (2016). Multilevel hybrid method for optimal buffer sizing and inspection stations positioning. SpringerPlus, 5(1), 1-21. Disponible

Mhada, F. Z., Ouzineb, M., Pellerin, R., & El Hallaoui, I. (2015). Multilevel hybrid method for solving buffer sizing and inspection stations allocation problems. (Rapport technique n° G-2015-96). Lien externe

Mhada, F. Z., Malhamé, R. P., Pellerin, R., Sadr, J., & Gharbi, A. (2013). (Q,s) Models for Inventory Policy with Random Component Procurement Lead Times. (Rapport technique n° G-2013-94). Lien externe

Mhada, F. Z., Malhamé, R. P., & Pellerin, R. (2012). Unreliable Production Lines with Defective Parts and Inspection Stations. (Rapport technique n° G-2012-92). Lien externe

Mhada, F. Z. (2011). Gestion conjointe de production et qualité appliquée aux lignes de production non fiables [Thèse de doctorat, École Polytechnique de Montréal]. Disponible

Mhada, F. Z., Malhamé, R. P., & Pellerin, R. (mai 2011). Unreliable production lines with defective parts and inspection stations [Communication écrite]. 8th Stochastic Models of Manufacturing and Service Operations Conference, Izmir, Turkey. Non disponible

Mhada, F. Z., & Malhamé, R. P. (2008). Aggregation Based Approximate Performance Analysis of CONWIP Disciplines in Unreliable Partially Homogeneous Transfer Lines. (Rapport technique n° G-2008-21). Lien externe

Mhada, F. Z., & Malhamé, R. P. (décembre 2008). Kolmogorov equations based approximate analysis and sizing of constant work in process unreliable manufacturing system loops [Communication écrite]. 47th IEEE Conference on Decision and Control (CDC 2008). Lien externe

O

Ouzineb, M., Mhada, F. Z., Pellerin, R., & El Hallaoui, I. (2018). Optimal planning of buffer sizes and inspection station positions. Production & Manufacturing Research, 6(1), 90-112. Lien externe

Ouzineb, M., Mhada, F. Z., Pellerin, R., & El Hallaoui, I. (2014). Optimal planning of buffer sizes and inspection station positions. (Rapport technique n° G-2014-53). Lien externe

Ouzineb, M., Mhada, F. Z., & El Hallaoui, I. (2013). Buffer Dimensioning and Control Stations Positioning with a Space Partitioning-Tabu Search Approach. (Rapport technique n° G-2013-112). Lien externe

Liste produite: Fri Dec 5 04:17:44 2025 EST.