Up a level |
This graph maps the connections between all the collaborators of {}'s publications listed on this page.
Each link represents a collaboration on the same publication. The thickness of the link represents the number of collaborations.
Use the mouse wheel or scroll gestures to zoom into the graph.
You can click on the nodes and links to highlight them and move the nodes by dragging them.
Hold down the "Ctrl" key or the "⌘" key while clicking on the nodes to open the list of this person's publications.
Maleki, M., Jelvez, E., Emery, X., & Morales, N. (2020). Stochastic open-pit mine production scheduling: A case study of an iron deposit. Minerals, 10(7), 585 (20 pages). External link
Moreno, E., Emery, X., Goycoolea, M., Morales, N., & Nelis, G. (2017, August). A two-stage stochastic model for open pit mine planning under geological uncertainty [Paper]. 38th International Symposium on the Application of Computers and Operations Research in the Mineral Industry (APCOM 2017), Denver, Colorado. External link
Vargas, E., Morales, N., & Emery, X. (2015, July). Cálculo de envolvente económica bajo incertidumbre geológica en minas de Block Caving [Paper]. 4th International Seminar on Mine Planning (MinePlanning 2015), Antofagasta, Chile. Unavailable
Alarcón, M., Morales, N., & Emery, X. (2015, May). Using simulation to assess the trade-off between value and reliability in open pit planning [Paper]. International Symposium on the Application of Computers and Operations Research In the Mineral Industry (APCOM 2015), Fairbanks, Alaska. External link
Vargas, E., Morales, N., & Emery, X. (2014, June). Footprint and economic envelope calculation. For block caving based mines under geological uncertainty [Paper]. 3rd International Symposium on Block and Sublevel Caving (Caving 2014), Santiago, Chile. External link
Alarcón, M., Morales, N., Emery, X., McFarlane, A., López, A., & Mancilla, D. (2014, December). Integrating data analysis, geostatistics and mine planning to compute the ultimate pit [Paper]. 2nd International Seminar on Geometallurgy (Geomet 2014), Santiago, Chile. Unavailable
Vargas, E., Morales, N., & Emery, X. (2013, July). Footprint and economic envelope calculation for block/panel caving mines under geological uncertainty [Poster]. 3rd International Seminar on Mine Planning (MinePlanning 2013), Santiago, Chile. Unavailable
Reyes, M., Emery, X., Jélvez, E., & Morales, N. (2012, January). Fast algorithms for open pit planning: Tackling uncertainty in mining [Paper]. 6o Seminario de Acercamiento Tecnológico, Calama, Chile. Unavailable
Reyes, M., Emery, X., & Morales, N. (2012, June). Final Pit: Simulated annealing approach with floating cones [Paper]. 5th International Conference on Innovation in Mine Operations (MININ 2012), Santiago, Chile. Unavailable
Morales, N., & Rubio, E. (2010, June). Robust open-pit planning under geological uncertainty [Paper]. 4th International Conference on Mining Innovation (MININ 2010), Santiago, Chile. Unavailable