Reinhard Bürgy, Hélène Michon-Lacaze and Guy Desaulniers
Technical Report (2018)
An external link is available for this itemDepartment: | Department of Mathematics and Industrial Engineering |
---|---|
Research Center: | GERAD - Research Group in Decision Analysis |
PolyPublie URL: | https://publications.polymtl.ca/64149/ |
Report number: | G-2018-18 |
Official URL: | https://www.gerad.ca/fr/papers/G-2018-18 |
Date Deposited: | 14 Apr 2025 13:28 |
Last Modified: | 14 Apr 2025 13:28 |
Cite in APA 7: | Bürgy, R., Michon-Lacaze, H., & Desaulniers, G. (2018). Employee scheduling with short demand perturbations and extensible shifts. (Technical Report n° G-2018-18). https://www.gerad.ca/fr/papers/G-2018-18 |
---|---|
Statistics
Stats are not available on this system.