Guy Desaulniers, Issmaïl El Hallaoui
, Mohammed Saddoune and François Soumis
Technical Report (2010)
An external link is available for this item| Department: | Department of Mathematics and Industrial Engineering |
|---|---|
| Research Center: | GERAD - Research Group in Decision Analysis |
| PolyPublie URL: | https://publications.polymtl.ca/63841/ |
| Report number: | G-2010-21 |
| Official URL: | https://www.gerad.ca/fr/papers/G-2010-21 |
| Date Deposited: | 09 May 2025 17:02 |
| Last Modified: | 09 May 2025 17:02 |
| Cite in APA 7: | Desaulniers, G., El Hallaoui, I., Saddoune, M., & Soumis, F. (2010). Integrated Airline Crew Scheduling: A Bi-Dynamic Constraint Aggregation Method using Neighborhoods. (Technical Report n° G-2010-21). https://www.gerad.ca/fr/papers/G-2010-21 |
|---|---|
Statistics
Stats are not available on this system.
