Alain Hertz, Gilbert Laporte, Michel Mittaz and Kathryn E. Stecke
Technical Report (1997)
An external link is available for this item| Department: | Department of Mathematics and Industrial Engineering |
|---|---|
| Research Center: | GERAD - Research Group in Decision Analysis |
| PolyPublie URL: | https://publications.polymtl.ca/63587/ |
| Report number: | G-97-03 |
| Official URL: | https://www.gerad.ca/fr/papers/G-97-03 |
| Date Deposited: | 06 May 2025 14:24 |
| Last Modified: | 06 May 2025 14:24 |
| Cite in APA 7: | Hertz, A., Laporte, G., Mittaz, M., & Stecke, K. E. (1997). Heuristics for Minimizing Tool Switches when Scheduling Part Types on a Flexible Machine. (Technical Report n° G-97-03). https://www.gerad.ca/fr/papers/G-97-03 |
|---|---|
Statistics
Stats are not available on this system.
