<  Back to the Polytechnique Montréal portal

Project Cost Curves for Convex Activity Costs

Stephan Foldes and François Soumis

Technical Report (1989)

An external link is available for this item
Department: Department of Mathematics and Industrial Engineering
Research Center: GERAD - Research Group in Decision Analysis
PolyPublie URL: https://publications.polymtl.ca/63527/
Report number: G-89-33
Official URL: https://www.gerad.ca/fr/papers/G-89-33
Date Deposited: 02 Apr 2025 16:07
Last Modified: 02 Apr 2025 16:07
Cite in APA 7: Foldes, S., & Soumis, F. (1989). Project Cost Curves for Convex Activity Costs. (Technical Report n° G-89-33). https://www.gerad.ca/fr/papers/G-89-33

Statistics

Stats are not available on this system.

Repository Staff Only

View Item View Item