<  Back to the Polytechnique Montréal portal

A Procedure for the calculation of trucks' waiting time and shovels' efficiency

Jorgen Elbrond

Technical Report (1974)

[img] Published Version
Terms of Use: All rights reserved.
Restricted to:
Registered users or access from Polytechnique onlyLog in using your matricule if you are not accessing this document from Polytechnique Montréal's buildings or VPN.

Request a copy
Cite this document: Elbrond, J. (1974). A Procedure for the calculation of trucks' waiting time and shovels' efficiency (Technical Report n° EP-R-74-13).
Show abstract Hide abstract

Abstract

The shovel-truck-crusher station system -- Calculations of the system -- Calculation procedure -- A simplified procedure -- Further developments.

Uncontrolled Keywords

Transports routiers; Durée du trajet (Technique de la circulation); Files d'attente, Théorie des

Open Access document in PolyPublie
Department: Département des génies civil, géologique et des mines
Date Deposited: 15 Apr 2021 15:13
Last Modified: 15 Jul 2021 17:03
PolyPublie URL: https://publications.polymtl.ca/6085/
Document issued by the official publisher
Report number: EP-R-74-13

Statistics

Total downloads

Downloads per month in the last year

Origin of downloads

Repository Staff Only