Jean-Claude Warmoes and Ravinder Dewan
Technical Report (1980)
![]() |
Restricted to: Registered users or access from Polytechnique Montréal onlyTo access this document, log in to PolyPublie (students and staff) or access this page from a device connected to the Polytechnique Montréal network (wired, wifi, or VPN). Visitors can obtain temporary access to the school’s computers at the Library’s loan desk. Published Version Terms of Use: All rights reserved Download (9MB) Request a copy |
Show abstract
Hide abstract
Résumé
Modèle probabiliste -- Structure du modèle -- Hypothèse du modèle -- Les états du pronet -- X i (t) ; i=1,2,3 -- Solution des équations pour obtenir les probabilités d'avoir 'n' travaux en différentes phases.
Department: | Department of Mathematics and Industrial Engineering |
---|---|
PolyPublie URL: | https://publications.polymtl.ca/6016/ |
Report number: | EP-R-80-36 |
Date Deposited: | 15 Apr 2021 15:13 |
Last Modified: | 01 Oct 2024 18:47 |
Cite in APA 7: | Warmoes, J.-C., & Dewan, R. (1980). Modèle probabiliste pour déterminer l'état du projet dans un réseau PERT. (Technical Report n° EP-R-80-36). https://publications.polymtl.ca/6016/ |
---|---|