Tommaso Schettini, Michel Gendreau, Ola Jabali and Federico Malucelli
Article (2024)
An external link is available for this itemDepartment: | Department of Mathematics and Industrial Engineering |
---|---|
Research Center: |
GERAD - Research Group in Decision Analysis CIRRELT - Interuniversity Research Centre on Enterprise Networks, Logistics and Transportation |
PolyPublie URL: | https://publications.polymtl.ca/57780/ |
Journal Title: | Public Transport (vol. 16) |
Publisher: | Springer |
DOI: | 10.1007/s12469-023-00339-2 |
Official URL: | https://doi.org/10.1007/s12469-023-00339-2 |
Date Deposited: | 28 Mar 2024 15:20 |
Last Modified: | 25 Sep 2024 16:49 |
Cite in APA 7: | Schettini, T., Gendreau, M., Jabali, O., & Malucelli, F. (2024). A pattern-based timetabling strategy for a short-turning metro line. Public Transport, 16, 37 pages. https://doi.org/10.1007/s12469-023-00339-2 |
---|---|
Statistics
Dimensions