Juan Pablo Usuga Cadavid, Samir Lamouri, Bernard Grabot, Robert Pellerin and Arnaud Fortin
Paper (2019)
An external link is available for this item| Department: | Department of Mathematics and Industrial Engineering |
|---|---|
| ISBN: | 9781728115665 |
| PolyPublie URL: | https://publications.polymtl.ca/44405/ |
| Conference Title: | International Conference on Industrial Engineering and Systems Management (IESM 2019) |
| Conference Location: | Shanghai, China |
| Conference Date(s): | 2019-09-25 - 2019-09-27 |
| Publisher: | IEEE |
| DOI: | 10.1109/iesm45758.2019.8948129 |
| Official URL: | https://doi.org/10.1109/iesm45758.2019.8948129 |
| Date Deposited: | 18 Apr 2023 15:01 |
| Last Modified: | 08 Apr 2025 12:23 |
| Cite in APA 7: | Cadavid, J. P. U., Lamouri, S., Grabot, B., Pellerin, R., & Fortin, A. (2019, September). Estimation of production inhibition time using data mining to improve production planning and control [Paper]. International Conference on Industrial Engineering and Systems Management (IESM 2019), Shanghai, China (6 pages). https://doi.org/10.1109/iesm45758.2019.8948129 |
|---|---|
Statistics
Dimensions
