Items where Author is "Grabot, Bernard"

Number of items: 8.

Author

Nguyen, A., Usuga-Cadavid, J. P., Lamouri, S., Grabot, B., & Pellerin, R. (2020, October). Understanding Data-Related Concepts in Smart Manufacturing and Supply Chain Through Text Mining [Paper]. 10th International Workshop on Service Oriented, Holonic and Multi-agent Manufacturing Systems for Industry of the Future (SOHOMA 2020), Paris, France. External link

Usuga Cadavid, J. P., Lamouri, S., Grabot, B., Pellerin, R., & Fortin, A. (2020). Machine learning applied in production planning and control: a state-of-the-art in the era of industry 4.0. Journal of Intelligent Manufacturing, 31(6), 1531-1558. External link

Usuga Cadavid, J. P., Grabot, B., Lamouri, S., Pellerin, R., & Fortin, A. (2020). Valuing free-form text data from maintenance logs through transfer learning with CamemBERT. Enterprise Information Systems, 16(6), 29 pages. External link

Cadavid, J. P. U., Lamouri, S., Grabot, B., Pellerin, R., & Fortin, A. (2019, September). Estimation of production inhibition time using data mining to improve production planning and control [Paper]. International Conference on Industrial Engineering and Systems Management (IESM 2019), Shanghai, China (6 pages). External link

Grabot, B. (1993). Systèmes de transport d'atelier : caractérisation des modes de marche nominal et dégradés. (Technical Report n° EPM-RT-93-20). Restricted access

Editor

Danjou, C., Le Duigou, J., & Eynard, B. (2014, September). OntoSTEP-NC for information feedbacks for CNC to CAS/CAM systems [Paper]. IFIP International Conference on Advanced Production Management Systems (APMS 2014), Ajaccio, France. External link

Ouzineb, M., Mhada, F.-Z., Pellerin, R., & El Hallaoui, I. (2014, September). A Hybrid Method for Solving Buffer Sizing and Inspection Stations Allocation [Paper]. IFIP International Conference on Advances in Production Management Systems (APMS 2014), Ajaccio, France. External link

Research Director

Clément, J. (2021). Utilisation de l'apprentissage automatique pour la planification de projet de construction [Master's thesis, Polytechnique Montréal]. Available

List generated on: Sun Nov 1 08:58:00 2026 EST