Haulage costs account for around a half of the total operating costs in large open-pit mines. One way to reduce the haulage costs is to shorten the haulage distances by bringing the truck dump point closer or even into the mine. There is a tendency in the direction of the high speed, large capacity conveyor systems, and these arrangements have been very productive. Conveying and truck-shovel systems compared to conventional truck-shovel systems alone, provide operating cost efficiency and high reliability of in-pit crushing, making those types of systems more appealing to be implemented in modern mining activities. The main elements to be considered in mine planning to implement an in-pit crusher system are conveyor layout and crusher position.
Résumé
Les coûts de transport représentent environ la moitié du coût total de fonctionnement (d'exploitation) dans les grandes mines à ciel ouvert. Une manière de réduire les coûts de transport est de raccourcir les distances de transport en rapprochant le point de déchargement du camion ou même de le placer dans la mine. Il y a une tendance à utiliser des systèmes de convoyeurs à grande vitesse et à grande capacité, lesquels ont été très productifs. Les systèmes de transport camion-pelle qu'utilisent des convoyeurs comparés aux conventionnels offrent une rentabilité opérationnelle supérieure et une grande fiabilité du concassage dans la fosse, ce qui les rend plus attrayants pour les activités minières modernes. Les principaux éléments à considérer dans la planification minière pour implémenter un système de concassage dans la fosse sont la disposition du convoyeur et la position du concasseur.
Department: | Department of Civil, Geological and Mining Engineering |
---|---|
Program: | Génie minéral |
Academic/Research Directors: | Michel Gamache and Roussos G. Dimitrakopoulos |
PolyPublie URL: | https://publications.polymtl.ca/2928/ |
Institution: | École Polytechnique de Montréal |
Date Deposited: | 03 Apr 2018 13:29 |
Last Modified: | 26 Sep 2024 21:35 |
Available Versions of this Item
- A Mixed-Integer Programming Model for an In-Pit Crusher Conveyor Location Problem. (Deposited on 03 Apr 2018 13:29) [Currently Displayed]
Cite in APA 7: | Jimenez Builes, C. A. (2017). A Mixed-Integer Programming Model for an In-Pit Crusher Conveyor Location Problem [Master's thesis, École Polytechnique de Montréal]. PolyPublie. https://publications.polymtl.ca/2928/ |
---|---|
Statistics
Total downloads
Downloads per month in the last year
Origin of downloads