Monter d'un niveau |
Belotti, P., Bonami, P., Fischetti, M., Lodi, A., Monaci, M., Nogales-Gomez, A., & Salvagnin, D. (2016). On handling indicator constraints in mixed integer programming. Computational Optimization and Applications, 65(3), 545-566. Lien externe
Cacchiani, V., Jünger, M., Liers, F., Lodi, A., & Schmidt, D. R. (2016). Single-commodity robust network design with finite and Hose demand sets. Mathematical Programming, 157(1), 297-342. Lien externe
Caprara, A., Carvalho, M., Lodi, A., & Woeginger, G. J. (2016). Bilevel knapsack with interdiction constraints. INFORMS Journal on Computing, 28(2), 319-333. Lien externe
Carvalho, M., Lodi, A., Pedroso, J. P., & Viana, A. (2016). Nash equilibria in the two-player kidney exchange game. Mathematical Programming, 161(1-2), 389-417. Lien externe
Fischetti, M., Lodi, A., Monaci, M., Salvagnin, D., & Tramontani, A. (2016). Improving branch-and-cut performance by random sampling. Mathematical Programming Computation, 8(1), 113-132. Lien externe
Leo, G., Lodi, A., Tubertini, P., & Di Martino, M. (2016). Emergency department management in Lazio, Italy. Omega, 58, 128-138. Lien externe
Lodi, A., Malaguti, E., Stier-Moses, N. E., & Bonino, T. (2016). Design and control of public-service contracts and an application to public transportation systems. Management Science, 62(4), 1165-1187. Lien externe
Lodi, A., Tubertini, P., Grilli, R., Mazzocchetti, A., Ruozi, C., & Senese, F. (2016). Needs forecast and fund allocation of medical specialty positions in Emilia-Romagna (Italy) by system dynamics and integer programming. Health Systems, 5(3), 213-236. Lien externe
Bonami, P., Lodi, A., Schweiger, J., & Tramontani, A. (2016). Solving standard quadratic programming by cutting planes. (Rapport technique n° DS4DM-2016-001). Lien externe
Bonami, P., Lodi, A., Tramontani, A., & Wiese, S. (2016). Cutting planes from wide spilt disjunctions. (Rapport technique n° DS4DM-2016-003). Lien externe
Lodi, A., & Moradi, A. (2016). Experiments on virtual private network design with concave capacity costs. (Rapport technique n° DS4DM-2016-004). Lien externe
Lodi, A., Malaguti, E., Thomopulos, D., & Nannicini, G. (mai 2016). Nonlinear Chance-Constrained Problems with applications to Hydro Scheduling [Communication écrite]. CORE@50 Conference, Louvain-la-Neuve, Belgique. Non disponible
Lodi, A., & Tubertini, P. (2016). Pre-operative activities and operating theater planning in Emilia-Romagna, Italy. Dans Optimization in the Real World (Vol. 13, p. 115-137). Lien externe