![]() | Monter d'un niveau |
Pellerin, R., Sadr, J., Gharbi, A., & Malhamé, R. P. (2009). A production rate control policy for stochastic repair and remanufacturing systems. International Journal of Production Economics, 121(1), 39-48. Lien externe
Berthaut, F., Pellerin, R., & Gharbi, A. (2009). Optimisation of the control policy for a stochastic remanufacturing system with an unreliable replacement parts supply. International Journal of Simulation and Process Modelling, 5(3), 205-214. Lien externe
Pellerin, R., & Gharbi, A. (2009). Production control of hybrid repair and remanufacturing systems under general conditions. Journal of Quality in Maintenance Engineering, 15(4), 383-396. Lien externe
Pellerin, R., Sadr, J., Gharbi, A., & Malhamé, R. P. (2009). A production rate control policy for stochastic repair and remanufacturing systems. International Journal of Production Economics, 121(1), 39-48. Lien externe