![]() | Up a level |
Berthaut, F., Pellerin, R., & Gharbi, A. (2009). Control of a repair and overhaul system with probabilistic parts availability. Production Planning & Control, 20(1), 57-67. External link
Berthaut, F., Pellerin, R., & Gharbi, A. (2009). Remanufacturing system control under unreliable supply of replacement parts. International Journal of Simulation and Process Modelling, 5(3), 205-214. External link
Hajji, A., Gharbi, A., Kenne, J. P., & Pellerin, R. (2009, June). Production control and replenishment strategy with multiple suppliers [Paper]. 8e Conférence internationale de génie industriel, Tarbes, France. Unavailable
Hajji, A., Pellerin, R., Gharbi, A., Léger, P. M., & Babin, G. (2009, May). Dynamic pricing models for ERP systems under network externality [Paper]. International Conference on Industrial Engineering and Systems Management (IESM 2009), Montréal, Québec. Unavailable
Mhada, F., Hajji, A., Malhamé, R. P., Pellerin, R., & Gharbi, A. (2009, May). Production control of unreliable manufacturing systems producing defective items [Paper]. International Conference on Industrial Engineering and Systems Management (IESM 2009), Montréal, Québec. Unavailable