![]() | Monter d'un niveau |
Bourjolly, J.-M., Gaboune, B., Laporte, G., & Soumis, F. (1994). Optimal Policies for Some Discrete Sequencing Problems Arising in Flexible Manufacturing. (Rapport technique n° G-93-31). Lien externe
Desrosiers, J., Dumas, Y., Solomon, M. M., & Soumis, F. (1994). Time Constrained Routing and Scheduling. (Rapport technique n° G-92-42). Lien externe
Desrosiers, J., Dumas, Y., Solomon, M. M., & Soumis, F. (juin 1994). A unified solution approach to time constrained vehicle routing and crew scheduling problems [Communication écrite]. 2nd Triennal Symposium on Transportation Analysis (Tristan II), Capri, Italy. Lien externe
D`Amours, S., Montreuil, B., & Soumis, F. (août 1994). Planning operations in symbiotic manufacturing network [Communication écrite]. IFAC International Conference on CAD/CAM: Robotics and Factories of the Future, Ottawa, Ont., Canada. Non disponible
Gaboune, B., Laporte, G., & Soumis, F. (1994). Optimal strip sequencing strategies for flexible manufacturing operations in two and three dimensions. International Journal of Flexible Manufacturing Systems, 6(2), 123-135. Lien externe
Ioachim, I., & Soumis, F. (1994). Scheduling Efficiency in a Robotic Production Cell. (Rapport technique n° G-93-05). Lien externe
Ribeiro, C. C., & Soumis, F. (1994). A column generation approach to the multiple-depot vehicle scheduling problem. Operations Research, 42(1), 41-52. Lien externe
Saïdi, S., Gendreau, M., & Soumis, F. (juin 1994). A dynamic assignment model for congested radial transit networks [Communication écrite]. 2nd Triennal Symposium on Transportation Analysis (Tristan II), Capri, Italy. Lien externe