Up a level |
This graph maps the connections between all the collaborators of {}'s publications listed on this page.
Each link represents a collaboration on the same publication. The thickness of the link represents the number of collaborations.
Use the mouse wheel or scroll gestures to zoom into the graph.
You can click on the nodes and links to highlight them and move the nodes by dragging them.
Hold down the "Ctrl" key or the "⌘" key while clicking on the nodes to open the list of this person's publications.
Lequy, Q., Bouchard, M., Desaulniers, G., Soumis, F., & Tachefine, B. (2012). Assigning multiple activities to work shifts. Journal of Scheduling, 15(2), 239-251. External link
Lequy, Q., Desaulniers, G., & Solomon, M. M. (2012). A two-stage heuristic for multi-activity and task assignment to work shifts. Computers and Industrial Engineering, 63(4), 831-841. External link
Lequy, Q. (2011). Affectation d'activités et de tâches à des quarts de travail fixés [Ph.D. thesis, École Polytechnique de Montréal]. Available