<  Back to the Polytechnique Montréal portal

Items where Author is "Lequy, Quentin"

Up a level
Export as [feed] Atom [feed] RSS 1.0 [feed] RSS 2.0
Jump to: L
Number of items: 3.

L

Lequy, Q., Bouchard, M., Desaulniers, G., Soumis, F., & Tachefine, B. (2012). Assigning multiple activities to work shifts. Journal of Scheduling, 15(2), 239-251. External link

Lequy, Q., Desaulniers, G., & Solomon, M. M. (2012). A two-stage heuristic for multi-activity and task assignment to work shifts. Computers and Industrial Engineering, 63(4), 831-841. External link

Lequy, Q. (2011). Affectation d'activités et de tâches à des quarts de travail fixés [Ph.D. thesis, École Polytechnique de Montréal]. Available

List generated on: Fri Dec 13 09:04:59 2024 EST