Up a level |
This graph maps the connections between all the collaborators of {}'s publications listed on this page.
Each link represents a collaboration on the same publication. The thickness of the link represents the number of collaborations.
Use the mouse wheel or scroll gestures to zoom into the graph.
You can click on the nodes and links to highlight them and move the nodes by dragging them.
Hold down the "Ctrl" key or the "⌘" key while clicking on the nodes to open the list of this person's publications.
Beaudoin, D., Frayret, J.-M., & LeBel, L. (2007). Negotiation-based distributed wood procurement planning within a multi firm environment. (Technical Report n° CIRRELT-2007-10). External link
Chauhan, S. S., Frayret, J.-M., & LeBel, L. (2009). Multi-commodity supply network planning in the forest supply chain. European Journal of Operational Research, 196(2), 688-696. External link
Chauhan, S. S., Frayret, J.-M., & LeBel, L. (2008). Supply network planning in the forest supply chain with bucking decisions anticipation. (Technical Report n° CIRRELT-2008-16). External link
Farnia, F., Frayret, J.-M., LeBel, L., & Beaudry, C. (2013). Multiple-round timber auction design and simulation. International Journal of Production Economics, 146(1), 129-141. Available
Farnia, F., Frayret, J.-M., Beaudry, C., & LeBel, L. (2013). Combinatorial auction for timber allocation and delivery coordination. (Technical Report n° CIRRELT-2013-86). External link
Farnia, F., Frayret, J.-M., LeBel, L., & Beaudry, C. (2013). Multiple-round timber auction design and simulation. (Technical Report n° CIRRELT-2013-12). External link
Toupin, D., LeBel, L., Dubeau, D., Imbeau, D., & Bouthillier, L. (2007). Measuring the Productivity and Physical Workload of Brushcutters Within the Context of a Production-Based Pay System. Forest Policy and Economics, 9(8), 1046-1055. External link