<  Back to the Polytechnique Montréal portal

Items where Author is "Gharbi, A."

Up a level
Export as [feed] Atom [feed] RSS 1.0 [feed] RSS 2.0
Jump to: B | G | H | K | M | P | V
Number of items: 30.

B

Bouslah, B., Gharbi, A., & Pellerin, R. (2016). Integrated production, sampling quality control and maintenance of deteriorating production systems with AOQL constraint. Omega, 61, 110-126. External link

Bouslah, B., Gharbi, A., & Pellerin, R. (2016). Joint economic design of production, continuous sampling inspection and preventive maintenance of a deteriorating production system. International Journal of Production Economics, 173, 184-198. External link

Boulash, B., Gharbi, A., & Pellerin, R. (2013, June). Intégration de la production, de la maintenance préventive conditionnelle et de contrôle de la qualité des systèmes manufacturiers en dégradation [Paper]. 10e Congrès international de génie industriel (CIGI 2013), La Rochelle, France. Unavailable

Bouslah, B., Gharbi, A., Pellerin, R., & Hajji, A. (2013). Optimal production control policy in unreliable batch processing manufacturing systems with transportation delay. International Journal of Production Research, 51(1), 264-280. External link

Bouslah, B., Gharbi, A., & Pellerin, R. (2012, August). A simulation-based optimization approach for an integrated production and quality control model [Paper]. 4th International Conference on Information Systems, Logistics and Supply Chain (ILS 2012), Québec, Canada. External link

Bouslah, B., Gharbi, A., & Pellerin, R. (2011, October). Lots économique de production et contrôle des systèmes manufacturiers non-fiables avec inspection rectifiante [Paper]. 9e Congrès international de génie industriel (CIGI 2011), St-Sauveur, Québec. External link

Berthaut, F., Gharbi, A., & Pellerin, R. (2010). Joint hybrid repair and remanufacturing systems and supply control. International Journal of Production Research, 48(14), 4101-4121. External link

Berthaut, F., Pellerin, R., & Gharbi, A. (2009). Control of a repair and overhaul system with probabilistic parts availability. Production Planning & Control, 20(1), 57-67. External link

Berthaut, F., Pellerin, R., & Gharbi, A. (2009). Remanufacturing system control under unreliable supply of replacement parts. International Journal of Simulation and Process Modelling, 5(3), 205-214. External link

Berthaut, F., Pellerin, R., & Gharbi, A. (2007, June). Contrôle de systèmes hybrides de réfection et de réparation avec disponibilité probabiliste des pièces de rechange [Paper]. 7e Congrès international de génie industriel, Trois-Rivières, Québec. Unavailable

Bedira, R., Gharsallah, A., Gharbi, A., Baudrand, H., & Wu, K. (2001, January). On the waves concept iterative process multiple scattering by conducting circulat cylinders [Paper]. 8th International Symposium on Microwave and Optical Technology (ISMOT 2001), Montréal, Québec. Unavailable

G

Gharbi, A., Pellerin, R., & Sadr, J. (2008). Production rate control policy for stochastic remanufacturing systems. International Journal of Production Economics, 112(1), 37-47. External link

Gharbi, A., Pellerin, R., & Villeneuve, L. (1999). A new constraint-based approach for overhaul project scheduling with work space constraints. International journal of industrial engineering, 6(2), 123-131. Unavailable

Gharbi, A., Girard, G., Pellerin, R., & Villeneuve, L. (1997). Bombardier turned to simulation to validate the CF-18 maintenance program. Interfaces, 27(6), 22-34. External link

Gharbi, A., Pellerin, R., & Villeneuve, L. (1997, September). Un système intégré de simulation pour la planification des projets de réfection [Paper]. 2e congrès international franco-québecois, Albi, France. Unavailable

Gharbi, A., Pellerin, R., & Villeneuve, L. (1995, July). Imporving overhaul project planning through simulation [Paper]. SCS Summer Computer Simulation Conference, Ottawa, Canada. Unavailable

Girard, G., Gharbi, A., Pellerin, R., & Villeneuve, L. (1995, October). La planification stratégique de projets de réfection par simulation [Paper]. Congrès international de génie industriel de Montréal, Montréal, Québec. Unavailable

Gharbi, A., & Villeneuve, L. (1994, October). A generic simulation model supported by financial analysis for fms design [Paper]. 27th International Symposium on Automotive Technology and Automation, Aachen, GER. Unavailable

H

Hajji, A., Gharbi, A., & Pellerin, R. (2012). Joint Production Control and Product Quality Decision Making in a Failure Prone Multiple-Product Manufacturing System. International Journal of Production Research, 50(13), 3661-3672. External link

Hajji, A., Mhada, F., Gharbi, A., Pellerin, R., & Malhamé, R. P. (2011). Integrated product specifications and productivity decision making in unreliable manufacturing systems. International Journal of Production Economics, 129(1), 32-42. External link

Hajji, A., Pellerin, R., Gharbi, A., Léger, P. M., & Babin, G. (2009, May). Dynamic pricing models for ERP systems under network externality [Paper]. International Conference on Industrial Engineering and Systems Management (IESM 2009), Montréal, Québec. Unavailable

Hajji, A., Gharbi, A., Kenne, J. P., & Pellerin, R. (2009, June). Production control and replenishment strategy with multiple suppliers [Paper]. 8e Conférence internationale de génie industriel, Tarbes, France. Unavailable

K

Kenné, J.-P., Boukas, E.-K., & Gharbi, A. (2003). Control of production and corrective maintenance rates in a multiple-machine, multiple-product manufacturing system. Mathematical and Computer Modelling, 38(3-4), 351-365. External link

M

Mhada, F., Hajji, A., Malhamé, R. P., Gharbi, A., & Pellerin, R. (2011). Production control of unreliable manufacturing systems producing defective items. Journal of Quality in Maintenance Engineering, 17(3), 238-253. External link

Mhada, F., Hajji, A., Malhamé, R. P., Pellerin, R., & Gharbi, A. (2009, May). Production control of unreliable manufacturing systems producing defective items [Paper]. International Conference on Industrial Engineering and Systems Management (IESM 2009), Montréal, Québec. Unavailable

P

Pellerin, R., Gharbi, A., & Artiba, A. (2007, May). Integration of a simulation based repair and overhaul execution strategy in ERP controlled environment [Paper]. Conference on Systems and Control (CSC 2007), Marrakech, Morocco. Unavailable

Pellerin, R., & Gharbi, A. (2007, May). Production control of remanufacturing systems with general repair time distributions [Paper]. International Conference on Industrial Engineering and Systems Management (IESM 2007), Beijing, Chine. Unavailable

V

Villeneuve, L., Gharbi, A., & Pellerin, R. (1997, September). Nouvelle approche d'ordonnancement multi-projets pour l'industrie de réfection [Paper]. 2e congrès international franco-québecois, Albi, France. Unavailable

Villeneuve, L., Gharbi, A., & Pellerin, R. (1997, June). La réalisation de projets de simulation en entreprise comme catalyseur de changements organisationnels [Paper]. 1ère Conférence francophone de modélisation et simulation, Rouen, France. Unavailable

Villeneuve, L., Gharbi, A., & Pellerin, R. (1996, April). Planification de projets de réfection avec contraintes de zone [Paper]. 5e Congrès international de génie industriel, Grenoble, France. Unavailable

List generated on: Sat May 17 06:54:42 2025 EDT