Documents dont l'auteur est "Berthaut, F."

Pour citer ou exporter
Nombre de documents: 5

Auteur ou autrice

Berthaut, F., Greze, L., Pellerin, R., Perrier, N., & Hajji, A. (mai 2011). Optimal resource-constraint project scheduling with overlapping modes [Communication écrite]. International Conference on Industrial Engineering and Systems Management (IESM 2011), Metz, France. Non disponible

Boucherit, J. B., Pellerin, R., Berthaut, F., & Hajji, A. (août 2010). A genetic algorithm for solving material space and resource constrained project problems [Communication écrite]. 12th MITIP Conference on Information Technology & Innovation Processes of the Enterprises, Aalborg, Denmark. Non disponible

Berthaut, F., Gharbi, A., & Pellerin, R. (2010). Joint hybrid repair and remanufacturing systems and supply control. International Journal of Production Research, 48(14), 4101-4121. Lien externe

Berthaut, F., Pellerin, R., & Gharbi, A. (2009). Control of a repair and overhaul system with probabilistic parts availability. Production Planning & Control, 20(1), 57-67. Lien externe

Berthaut, F., Pellerin, R., & Gharbi, A. (juin 2007). Contrôle de systèmes hybrides de réfection et de réparation avec disponibilité probabiliste des pièces de rechange [Communication écrite]. 7e Congrès international de génie industriel, Trois-Rivières, Québec. Non disponible

Liste produite: Thu Oct 15 19:51:20 2026 EDT.