A systematic literature review of the logistics planning for sustainable bioenergy based on Forestry, Agricultural, and municipal solid waste value chains

Seyyedeh Rozita Ebrahimi, Mikael Rönnqvist, Mustapha Ouhimmou, Paul R. Stuart

Article de revue (2025)

Accéder à ce document
Disponible
Libre accès au texte intégral dans PolyPublie et chez l'éditeur officiel
Version officielle de l'éditeur
Texte Texte • 4MB •

Résumé

Sustainable bioenergy production is essential for mitigating greenhouse gas emissions and reducing dependence on fossil fuels. The logistics of managing dispersed and low-value biomass from forestry, agricultural, and municipal solid waste value chains pose significant challenges, including high transportation costs, seasonal availability, and storage limitations. This systematic literature review examines the critical operations, including collection, transportation, and preprocessing, necessary to optimize bioenergy supply chains. A central contribution of this paper is an analysis of integrating biomass value chains through collaborative models that leverage shared infrastructure and adaptive logistics to enhance cost efficiency and resource utilization. It also identifies critical gaps in optimization models, particularly the lack of comprehensive multi-biomass value chain integration frameworks and limited consideration of uncertainties in logistics planning. The analysis highlights that while mixed integer linear programming models dominate, they often overlook cross-chain synergies and logistics. By examining 112 articles, we show that integrating forestry, agricultural, and municipal solid waste value chains through shared infrastructure and collaborative planning can significantly reduce transportation costs, enhance supply stability, and improve resource utilization in bioenergy systems.

Mots clés

Organismes subventionnaires:
Horizon 2020, NFRF, FRQ
Numéro de subvention:
101022432
Adresse URL de PolyPublie:
Titre de la revue :
Energy Conversion and Management: X ( vol. 27 )
Maison d'édition:
Elsevier BV
OAI:
oai:publications.polymtl.ca:66319
ORCID
Date du dépôt:
26 juin 2025 14:48
Dernière modification:
30 oct. 2026 09:30
Citer en APA 7:
Rozita Ebrahimi, S., Rönnqvist, M., Ouhimmou, M., & Stuart, P. R. (2025). A systematic literature review of the logistics planning for sustainable bioenergy based on Forestry, Agricultural, and municipal solid waste value chains. Energy Conversion and Management: X, 27, 101105 (24 pages). https://doi.org/10.1016/j.ecmx.2025.101105

Statistiques

Total des téléchargements à partir de PolyPublie

Téléchargements par année

Provenance des téléchargements

Dimensions

Actions réservées au personnel

Afficher document
Afficher document