Sara Rankohi, David Smith, Gonzalo Lizarralde, Mario Bourgault and Robert Pellerin
Paper (2023)
An external link is available for this item| Department: | Department of Mathematics and Industrial Engineering |
|---|---|
| ISBN: | 9783031614996 |
| PolyPublie URL: | https://publications.polymtl.ca/60273/ |
| Conference Title: | Canadian Society of Civil Engineering Annual Conference (CSCE 2023) |
| Conference Location: | Moncton, NB, Canada |
| Conference Date(s): | 2023-05-24 - 2023-05-27 |
| Publisher: | Springer |
| DOI: | 10.1007/978-3-031-61499-6_7 |
| Official URL: | https://doi.org/10.1007/978-3-031-61499-6_7 |
| Date Deposited: | 25 Nov 2024 15:14 |
| Last Modified: | 25 Nov 2024 15:14 |
| Cite in APA 7: | Rankohi, S., Smith, D., Lizarralde, G., Bourgault, M., & Pellerin, R. (2023, May). Barriers to the Implementation of Integrated Design Processes—The Case of the Construction Industry in Quebec, Canada [Paper]. Canadian Society of Civil Engineering Annual Conference (CSCE 2023), Moncton, NB, Canada. https://doi.org/10.1007/978-3-031-61499-6_7 |
|---|---|
Statistics
Dimensions
