<  Back to the Polytechnique Montréal portal

Minimizing the sum of earliness and tardiness in the multi-factory two-stage assembly scheduling problem

Hamed Kazemi, Mustapha Nourelfath and Michel Gendreau

Article (2024)

An external link is available for this item
Department: Department of Mathematics and Industrial Engineering
Research Center: CIRRELT - Interuniversity Research Centre on Enterprise Networks, Logistics and Transportation
Funders: Natural Sciences and Engineering Research Council of Canada
PolyPublie URL: https://publications.polymtl.ca/59824/
Journal Title: Journal of Industrial and Production Engineering
Publisher: Taylor & Francis
DOI: 10.1080/21681015.2024.2411973
Official URL: https://doi.org/10.1080/21681015.2024.2411973
Date Deposited: 19 Nov 2024 11:21
Last Modified: 19 Nov 2024 11:21
Cite in APA 7: Kazemi, H., Nourelfath, M., & Gendreau, M. (2024). Minimizing the sum of earliness and tardiness in the multi-factory two-stage assembly scheduling problem. Journal of Industrial and Production Engineering, 1-16. https://doi.org/10.1080/21681015.2024.2411973

Statistics

Dimensions

Repository Staff Only

View Item View Item