Hamed Kazemi, Mustapha Nourelfath and Michel Gendreau
Article (2024)
An external link is available for this itemDepartment: | Department of Mathematics and Industrial Engineering |
---|---|
Research Center: | CIRRELT - Interuniversity Research Centre on Enterprise Networks, Logistics and Transportation |
Funders: | Natural Sciences and Engineering Research Council of Canada |
PolyPublie URL: | https://publications.polymtl.ca/59824/ |
Journal Title: | Journal of Industrial and Production Engineering |
Publisher: | Taylor & Francis |
DOI: | 10.1080/21681015.2024.2411973 |
Official URL: | https://doi.org/10.1080/21681015.2024.2411973 |
Date Deposited: | 19 Nov 2024 11:21 |
Last Modified: | 19 Nov 2024 11:21 |
Cite in APA 7: | Kazemi, H., Nourelfath, M., & Gendreau, M. (2024). Minimizing the sum of earliness and tardiness in the multi-factory two-stage assembly scheduling problem. Journal of Industrial and Production Engineering, 1-16. https://doi.org/10.1080/21681015.2024.2411973 |
---|---|
Statistics
Dimensions