<  Back to the Polytechnique Montréal portal

The multi-factory two-stage assembly scheduling problem

Hamed Kazemi, Mustapha Nourelfath and Michel Gendreau

Article (2024)

An external link is available for this item
Department: Department of Mathematics and Industrial Engineering
Research Center: CIRRELT - Interuniversity Research Centre on Enterprise Networks, Logistics and Transportation
PolyPublie URL: https://publications.polymtl.ca/57551/
Journal Title: Journal of Industrial Information Integration (vol. 38)
Publisher: Elsevier B.V.
DOI: 10.1016/j.jii.2024.100574
Official URL: https://doi.org/10.1016/j.jii.2024.100574
Date Deposited: 28 Feb 2024 14:05
Last Modified: 25 Sep 2024 16:49
Cite in APA 7: Kazemi, H., Nourelfath, M., & Gendreau, M. (2024). The multi-factory two-stage assembly scheduling problem. Journal of Industrial Information Integration, 38, 100574 (14 pages). https://doi.org/10.1016/j.jii.2024.100574

Statistics

Dimensions

Repository Staff Only

View Item View Item