Hamed Kazemi, Mustapha Nourelfath and Michel Gendreau
Article (2024)
An external link is available for this item| Department: | Department of Mathematics and Industrial Engineering |
|---|---|
| Research Center: | CIRRELT - Interuniversity Research Centre on Enterprise Networks, Logistics and Transportation |
| PolyPublie URL: | https://publications.polymtl.ca/57551/ |
| Journal Title: | Journal of Industrial Information Integration (vol. 38) |
| Publisher: | Elsevier B.V. |
| DOI: | 10.1016/j.jii.2024.100574 |
| Official URL: | https://doi.org/10.1016/j.jii.2024.100574 |
| Date Deposited: | 28 Feb 2024 14:05 |
| Last Modified: | 08 Apr 2025 07:27 |
| Cite in APA 7: | Kazemi, H., Nourelfath, M., & Gendreau, M. (2024). The multi-factory two-stage assembly scheduling problem. Journal of Industrial Information Integration, 38, 100574 (14 pages). https://doi.org/10.1016/j.jii.2024.100574 |
|---|---|
Statistics
Dimensions
