Pierre-Luc Carpentier, Michel Gendreau and Fabian Bastin
Technical Report (2012)
An external link is available for this itemDepartment: | Department of Mathematics and Industrial Engineering |
---|---|
Research Center: | CIRRELT - Interuniversity Research Centre on Enterprise Networks, Logistics and Transportation |
PolyPublie URL: | https://publications.polymtl.ca/54974/ |
Report number: | CIRRELT-2012-35 |
Official URL: | https://www.cirrelt.ca/documentstravail/cirrelt-20... |
Date Deposited: | 08 Sep 2023 16:24 |
Last Modified: | 25 Sep 2024 16:46 |
Cite in APA 7: | Carpentier, P.-L., Gendreau, M., & Bastin, F. (2012). Midterm hydro generation scheduling under uncertainty using the progressive hedging algorithm. (Technical Report n° CIRRELT-2012-35). https://www.cirrelt.ca/documentstravail/cirrelt-2012-35.pdf |
---|---|
Statistics
Stats are not available on this system.