Robert Pellerin, Nathalie Perrier and François Berthaut
Article (2019)
An external link is available for this item| Department: | Department of Mathematics and Industrial Engineering |
|---|---|
| Research Center: | CIRRELT - Interuniversity Research Centre on Enterprise Networks, Logistics and Transportation |
| PolyPublie URL: | https://publications.polymtl.ca/43029/ |
| Journal Title: | European Journal of Operational Research (vol. 280, no. 2) |
| Publisher: | Elsevier B.V. |
| DOI: | 10.1016/j.ejor.2019.01.063 |
| Official URL: | https://doi.org/10.1016/j.ejor.2019.01.063 |
| Date Deposited: | 18 Apr 2023 15:02 |
| Last Modified: | 08 Apr 2025 07:07 |
| Cite in APA 7: | Pellerin, R., Perrier, N., & Berthaut, F. (2019). A survey of hybrid metaheuristics for the resource-constrained project scheduling problem. European Journal of Operational Research, 280(2), 395-416. https://doi.org/10.1016/j.ejor.2019.01.063 |
|---|---|
Statistics
Dimensions
